RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of Bidarahalli Lower Primary School Compound. The project location is Nyamati, Karnataka, India. The reference number is RDPR/2023-24/IND0394 and it is closing on 2-Dec-2023. Find more about this online tender from below to Submit your bid.
Posting Date
27-Nov-2023
Closing Date
2-Dec-2023
Tender Amount
643849.53
Construction Of Bidarahalli Lower Primary School Compound 1. Boulderss., Qty: 38.48 Cum, Amt: 25590.53 2. Bolts and nuts, Qty: 36.12 Kg, Amt: 2571.42 3. MS flat., Qty: 22.58 Kg, Amt: 1110.56 4. Transportation/ loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution., Qty: 66724.26 Lump Sum for Each, Amt: 66724.27 5. Add watering charges at 1% on Material., Qty: 3183.39 Lump Sum for Each, Amt: 3183.39 6. Add sundries charges at 1% on Material., Qty: 3778.89 Lump Sum for Each, Amt: 3778.90 7. Mixer (concrete) -1cum Capacity, Qty: 3.15 Day, Amt: 4268.56 8. HOM of Vibrator 0.71 -days, Qty: 1.88 Day, Amt: 318.45 9. TMT bars Fe 500-, Qty: 1.45 Tonne, Amt: 102493.77 10. Silver oak or equivalent planks 38mm thick., Qty: 0.77 Cum, Amt: 16358.00 11. Jungle wood runners and .planks., Qty: 1.38 Cum, Amt: 40073.61 12. Broken Stone Aggregate 40 .mm size, Qty: 6.57 Cum, Amt: 7818.48 13. Broken stone aggregate 20.mm size, Qty: 16.64 Cum, Amt: 21394.86 14. Broken stone aggregate 12.mm to 10 mm size, Qty: 10.21 Cum, Amt: 13124.53 15. Mixer -(concrete small used in culvert), Qty: 12.21 Hour, Amt: 513.01 16. GPCHIN-MR9753-Add Handling , loading and unloading at 2% on Material, Qty: 1486.85 Lump Sum for Each, Amt: 1486.85 17. Bindingwire-, Qty: 13.52 Kg, Amt: 744.69 18. Coarse sand (zone III.), Qty: 45.02 Cum, Amt: 75440.71 19. Portland-.Cement, Qty: 14.84 Tonne, Amt: 103606.39 20. Add sundries charges at -2% on Material, Qty: 1493.90 Lump Sum for Each, Amt: 1493.90 21. Add providing and removing scaffolding at -3% on Labour, Qty: 392.54 Lump Sum for Each, Amt: 392.54 22. Add Handling-loading and unloading at 1% on Material, Qty: 108.63 Lump Sum for Each, Amt: 108.63 23. Add Brush, putty, sand paper at -2% on cost of paint, Qty: 205.92 Lump Sum for Each, Amt: 205.92 24. Mason Class-I (with tools), Qty: 96.72 Day, Amt: 42187.66 25. Painter Class- I, Qty: 17.16 Day, Amt: 7485.20