RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of Compound For Belalakatte Government Higher Primary School. The project location is Nyamati, Karnataka, India. The reference number is RDPR/2023-24/IND0393 and it is closing on 2-Dec-2023. Find more about this online tender from below to Submit your bid.
Posting Date
27-Nov-2023
Closing Date
2-Dec-2023
Tender Amount
1297108.60
Construction Of Compound For Belalakatte Government Higher Primary School 1. Tools and Plants at2% on material, Qty: 420.68 Lump Sum for Each, Amt: 420.68 2. Transportation loading and unloading at1% on material, Qty: 210.33 Lump Sum for Each, Amt: 210.33 3. Add Brush at 1% on cost of paint., Qty: 24.75 Lump Sum for Each, Amt: 24.75 4. HOM of welding and grinding .machine., Qty: 7.33 Day, Amt: 2486.03 5. HOM of cutting and grinding machine -1, Qty: 117.33 Hour, Amt: 4928.02 6. Welder Grade-I, Qty: 14.67 Day, Amt: 6397.58 7. Mechanic Class II/Mechanic HmP Grade I/EME Grade., Qty: 29.33 Day, Amt: 12355.19 8. Enamel metal paint., Qty: 9.90 Ltr, Amt: 2055.50 9. Cast iron spike., Qty: 66.00 No, Amt: 5593.50 10. Ball bearing hinges heavy duty., Qty: 14.67 No, Amt: 3480.27 11. MS Hollow pipe 50 mm dia B Class 14 Gauge., Qty: 152.94 Kg, Amt: 7776.84 12. MS Plates 40 x 6 mm., Qty: 99.11 Kg, Amt: 3695.82 13. MS Plates 36 mm x 6 mm, Qty: 185.20 Kg, Amt: 6906.24 14. MS Square rod 16 x 16 mm., Qty: 208.38 Kg, Amt: 7770.36 15. Plasticizer/super plasticizer., Qty: 149.55 Kg, Amt: 8871.13 16. Anticorrosive bituminous paint (black)., Qty: 11.00 Ltr, Amt: 1305.03 17. Broken Stone Aggregate 40 .mm size, Qty: 9.40 Cum, Amt: 11194.21 18. Broken stone aggregate 20.mm size, Qty: 27.33 Cum, Amt: 35142.32 19. Broken stone aggregate 12.mm to 10 mm size, Qty: 16.47 Cum, Amt: 21170.51 20. Coarse sand (zone III.), Qty: 90.52 Cum, Amt: 151688.96 21. Portland-.Cement, Qty: 32.78 Tonne, Amt: 228800.22 22. Add watering charges at 1% on Material., Qty: 7226.77 Lump Sum for Each, Amt: 7226.77 23. Add sundries charges at -2% on Material, Qty: 12.41 Lump Sum for Each, Amt: 12.42 24. Add sundries charges at 1% on Material., Qty: 10134.02 Lump Sum for Each, Amt: 10134.02 25. Add providing and removing scaffolding at -3% on Labour, Qty: 899.40 Lump Sum for Each, Amt: 899.40 26. Over Head & other-Miscellaneous Charges., Qty: 130379.50 Lump Sum for Each, Amt: 130379.50 27. Add Handling loading and unloading at 2% on -Material, Qty: 770.97 Lump Sum for Each, Amt: 770.97