RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Tender Inviting Of Supping Of Construction Materials For Sanjeevini Shed Sanyasi Halli Gp, Belur Taluk, Hassan.. The project location is Belur, Karnataka, India. The reference number is RDPR/2023-24/IND0605 and it is closing on 27-Dec-2023. Find more about this online tender from below to Submit your bid.
Posting Date
19-Dec-2023
Closing Date
27-Dec-2023
Tender Amount
1249046.98
Tender Inviting Of Supping Of Construction Materials For Sanjeevini Shed Sanyasi Halli Gp, Belur Taluk, Hassan. 1. Water Tanker (BELUR), Qty: 4.08 Hour, Amt: 212.16 2. Generator 33 KVA (BELUR), Qty: 8.16 Hour, Amt: 2048.16 3. Mixer (concrete small used in culvert) (BELUR), Qty: 29.53 Hour, Amt: 1240.26 4. Mason Class I (with tools) (BELUR), Qty: 109.65 Day, Amt: 47829.33 5. Water (BELUR), Qty: 24.49 K.Ltr, Amt: 979.60 6. Portland Cement (BELUR), Qty: 25.24 Tonne, Amt: 176175.20 7. Coarse sand (zone III) (BELUR), Qty: 56.78 Cum, Amt: 95149.66 8. Broken stone aggregate 40 mm size (BELUR), Qty: 17.13 Cum, Amt: 20392.93 9. Add sundries charges at 1 % on Material (BELUR), Qty: 7369.23 Lump Sum for Each, Amt: 7369.23 10. Over Head & other Miscellaneous Charges (BELUR), Qty: 103752.01 Lump Sum for Each, Amt: 103752.01 11. Tractor - 40 HP (BELUR), Qty: 3.00 Hour, Amt: 483.00 12. Vitrified tiles 10 mm thick 600 x 600 mm (BELUR), Qty: 108.91 Sqm, Amt: 44302.41 13. Lime (BELUR), Qty: 0.82 Cum, Amt: 3116.00 14. Add providing and removing scaffolding at 3% on Labour (BELUR), Qty: 1104.16 Lump Sum for Each, Amt: 1104.16 15. Burnt bricks class 35 (non modular) (BELUR), Qty: 1957.46 No, Amt: 14876.70 16. Add Handling , loading and unloading at 1% on Material (BELUR), Qty: 196.19 Lump Sum for Each, Amt: 196.19 17. Casurina poles 100 - 150 mm (BELUR), Qty: 15.53 Mtr, Amt: 737.06 18. Solid concrete blocks (40 x 15 x 20 cms)-4.00 N/Sqmm (BELUR), Qty: 1211.91 No, Amt: 35872.54 19. Formwork, Centering & Scaffolding for Chejjas, Canopy & Other Architectural projections of minor sections - 45% (BELUR), Qty: 1713.67 Lump Sum for Each, Amt: 1713.67 20. Formwork, Centering & Scaffolding for Roof (Straight & Arched) - 50% (BELUR), Qty: 54833.89 Lump Sum for Each, Amt: 54833.89 21. Formwork, Centering & Scaffolding for Beams & Lintels of Building - 60% (BELUR), Qty: 36822.92 Lump Sum for Each, Amt: 36822.92 22. Formwork, Centering & Scaffolding For Columns & Piers-70% (BELUR), Qty: 29681.58 Lump Sum for Each, Amt: 29681.58