RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of Nrlm Shg Shed Badarli Gp Sindhanur Taluk. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND0709 and it is closing on 31-Jan-2024. Find more about this online tender from below to Submit your bid.
Posting Date
2-Jan-2024
Closing Date
31-Jan-2024
Tender Amount
1179010.85
Construction Of Nrlm Shg Shed Badarli Gp Sindhanur Taluk 1. TMT bars Fe 500.BBB, Qty: 3.58 Tonne, Amt: 215522.92 2. Portland Cement.BBB, Qty: 24.49 Tonne, Amt: 143529.57 3. Vitrified tiles 600x600 mm.BBB, Qty: 104.37 Sqm, Amt: 58449.55 4. Ceramic tiles of size 30 x 30 cms.BBB, Qty: 80.19 Sqm, Amt: 24057.00 5. White cement.BBB, Qty: 0.07 Quintal, Amt: 113.91 6. Burnt bricks class 35 (non modular).BBB, Qty: 1001.00 No, Amt: 7607.58 7. Solid concrete blocks (40x20x20 cms) 5.00 N per Sqmm.BBB, Qty: 1745.47 No, Amt: 75055.16 8. PVC pipe of 10kg per cum,90 mm.BBB, Qty: 8.00 Mtr, Amt: 2700.40 9. G.I. Overflow pipe 20mm dia.BBB, Qty: 3.70 Mtr, Amt: 486.03 10. Casurina poles 100 - 150 mm.BBB, Qty: 183.02 Mtr, Amt: 8685.99 11. Casurina Poles 75 - 100 mm dia.BBB, Qty: 19.99 Mtr, Amt: 745.26 12. Labour charges for handing errection of RCC rings etc. at 5%.BBB, Qty: 121.05 LS, Amt: 121.05 13. Transportation charges of materials beyond 5 KM at 10%.BBB, Qty: 242.10 LS, Amt: 242.10 14. Handling loading and unloading 3% on Material.BBB, Qty: 189.00 LS, Amt: 189.00 15. Labour charges for lifting and placing in position and making connection at 7% on Material.BBB, Qty: 441.00 LS, Amt: 441.00 16. Add White lead paint, gasket, cement, sand for making good the wall and floor at 2% on Material.BBB, Qty: 164.94 LS, Amt: 164.94 17. Add Brush at 1% on cost of paint.BBB, Qty: 3.76 LS, Amt: 3.76 18. Add Wire brush, fine steel wool, putty, sand paper, at 3% on cost of paint.BBB, Qty: 3.84 LS, Amt: 3.84 19. Add HOM of welding and grinding machine at 4% on Material.BBB, Qty: 517.82 LS, Amt: 517.82 20. Add cutting and other wastage 5%.BBB, Qty: 1995.40 LS, Amt: 1995.40 21. Add Brush, putty, sand paper roller at 5% on cost of paint.BBB, Qty: 562.91 LS, Amt: 562.91 22. Add Brush, putty, sand paper at 2% on cost of paint.BBB, Qty: 67.46 LS, Amt: 67.46 23. Add providing and removing scaffolding at 3% on Labour.BBB, Qty: 1653.80 LS, Amt: 1653.80 24. Add Handling , loading and unloading at 1% on Material.BBB, Qty: 784.24 LS, Amt: 784.24