RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Tender Inviting For Construction Materials To Govt High School Play Ground Bageshpura Gp Arasikere Taluk, Hassan Dist.. The project location is Arsikere, Karnataka, India. The reference number is RDPR/2023-24/IND0413/CALL-4 and it is closing on 2-Feb-2024. Find more about this online tender from below to Submit your bid.
Posting Date
27-Jan-2024
Closing Date
2-Feb-2024
Tender Amount
949884.98
Tender Inviting For Construction Materials To Govt High School Play Ground Bageshpura Gp Arasikere Taluk, Hassan Dist. 1. Add sundries charges at 1 % on Labour (BAG01), Qty: 2376.75 Lump Sum for Each, Amt: 2376.75 2. Over Head & other Miscellaneous Charges (BAG01), Qty: 72912.60 Lump Sum for Each, Amt: 72912.60 3. Water (BAG01), Qty: 132.71 K.Ltr, Amt: 5308.44 4. Gravel 2.36 mm/Murrum (BAG01), Qty: 880.89 Cum, Amt: 167791.62 5. Laboratory Asst. (SSLC Passed)/Mate/Supervisor (BAG01), Qty: 0.22 Day, Amt: 99.53 6. Water Tanker (BAG01), Qty: 22.12 Hour, Amt: 1150.16 7. Vibratory Roller 8 Tonne (BAG01), Qty: 5.53 Hour, Amt: 6093.62 8. Coarse sand (zone III) (BAG01), Qty: 231.82 Cum, Amt: 388476.36 9. Portland Cement (BAG01), Qty: 21.21 Tonne, Amt: 148022.07 10. Brick bats 25 to 100 mm (BAG01), Qty: 6.80 Cum, Amt: 4033.96 11. Water proofing materials (BAG01), Qty: 79.33 Kg, Amt: 3361.35 12. Mason Class I (with tools) (BAG01), Qty: 17.00 Day, Amt: 7415.36 13. Mason Class II (with tools) (BAG01), Qty: 20.78 Day, Amt: 8751.61 14. Add Handling, loading and unloading at 2% on Material (BAG01), Qty: 1048.23 Lump Sum for Each, Amt: 1048.23 15. Add sundries charges at 2 % on Material (BAG01), Qty: 1048.23 Lump Sum for Each, Amt: 1048.23 16. Add watering charges at 2 % on Material (BAG01), Qty: 1048.23 Lump Sum for Each, Amt: 1048.23 17. Broken stone aggregate 40 mm size (BAG01), Qty: 10.34 Cum, Amt: 12306.83 18. Broken stone aggregate 20 mm size (BAG01), Qty: 13.83 Cum, Amt: 17782.78 19. Broken stone aggregate 12 mm to 10 mm size (BAG01), Qty: 9.67 Cum, Amt: 12435.00 20. Mixer (concrete) -1 cum Capacity (BAG01), Qty: 3.08 Day, Amt: 4178.79 21. Add watering charges at 1 % on Material (BAG01), Qty: 1447.82 Lump Sum for Each, Amt: 1447.82 22. Add sundries charges at 1 % on Material (BAG01), Qty: 1900.01 Lump Sum for Each, Amt: 1900.01 23. Plasticizer / super plasticizer (BAG01), Qty: 57.24 Kg, Amt: 3395.48 24. HOM of Vibrator 0.71 days (BAG01), Qty: 1.35 Day, Amt: 228.94 25. TMT bars Fe 500 (BAG01), Qty: 0.35 Tonne, Amt: 24639.69