KARNATAKA INDUSTRIAL AREAS DEVELOPMENT BOARD (KIADB) has floated a e tender for Design Construction Testing & Commissioning For Implementation Of 45Mld Combined Water Supply Scheme To Proposed Mahalbagyat, Aliyabad Industrial Area, Airport And Newly Proposed Bhuranapur And Madhab.... The project location is Bengaluru, Karnataka, India. The reference number is KIADB/2023-24/OW/WORK_INDENT103 and it is closing on 19-Feb-2024. Find more about this online tender from below to Submit your bid.
Posting Date
12-Feb-2024
Closing Date
19-Feb-2024
Tender Amount
1874418000.00
Design Construction Testing & Commissioning For Implementation Of 45Mld Combined Water Supply Scheme To Proposed Mahalbagyat, Aliyabad Industrial Area, Airport And Newly Proposed Bhuranapur And Madhabhavi Industrial Area Of Vijayapur Taluk & District Including Operation & Maintenance For 5 Years On Turnkey Basis. Implementation (Design, Construction, Testing & Commissioning Including O&M) Of 45 Mld Combined Water Supply Scheme To Mahalbagayat, Aliyabad Indsutrial Area, Airport And Newly Proposed Bhuranapur And Madhabhavi Industrial Area In Of Vijayapura Taluk, Vijayapura District From Existing Jackwell At Krishna River, Kolhar Village Upstream Of Almatti Dam, Supplying And Erecting Motor & Pumping Macheniries At Pump House, Establishment Of Sub Station Along With Civil Structures, Supplying, Providing, Laying, Testing & Commissioning Of Various Diameter Mild Steel Pipes As Raising Main From Jackwell To Delivery Chamber At Proposed Industrial Layouts, To Airport As Mentioned Above For A Total Length Of 71305 Mts., River Crossing & Canal Crossing For Ms Rising Main, Construction Of Crossing Structures For Crossing Of River, State Highways, Nalas, Roads (Flexible & Rigid Pavements), Railway Crossings, Construction Of Valve Chambers Including Providing And Erecting Sluice, Air Valves Etc, Anchor Blocks, Thrust Blocks, Box Type Concrete Encasements, Surge Protection Works, Establishment & Commissioning Of 33 Kv Electrical Substation With Transformers (One Standby) Including Erection Of 33Kv Transmission Line From The Nearby Kptcl Sub Station(12Km- At Ronihala), Design, Supply, Installation And Commissioning Of Pumping Machinery And Electrical Works Of Vertical Turbine Pumps, Scada Soft Ware System, Earth Work Excavation In All Type Of Soils, Survey, Investigation & Commissioning Of The Project, Including Operation And Maintenance For 5 Years Including All The Geo Physical & Geo Technical Investigation For Successful Implementation Of The Project.