RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supplying Construction Materials For The Box Drainage Works Under Mgnrega Scheme In Adderi Village Hirebilagunji Gp Sagar Taluk. The project location is Sagar, Karnataka, India. The reference number is RDPR/2023-24/IND1035/CALL-2 and it is closing on 2-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
24-Feb-2024
Closing Date
2-Mar-2024
Tender Amount
500371.34
Supplying Construction Materials For The Box Drainage Works From Ramappa House To Upto School Compound In Adderi Village Hirebilagunji Gp Sagar Taluk Shivamogga 1. Box Drainage Broken stone aggregate 40 mm size, Qty: 14.03 Cum, Amt: 16696.48 2. Box Drainage Broken stone aggregate 20 mm size, Qty: 24.99 Cum, Amt: 32131.05 3. Box Drainage Broken stone aggregate 12 mm to 10 mm size, Qty: 16.36 Cum, Amt: 21031.77 4. Box Drainage Coarse sand (zone III), Qty: 37.03 Cum, Amt: 62046.69 5. Box Drainage Portland Cement, Qty: 18.61 Tonne, Amt: 129911.76 6. Box Drainage Mixer (concrete) - 1 cum Capacity, Qty: 5.15 Day, Amt: 6989.64 7. Box Drainage Add watering charges at 1 % on Material, Qty: 2478.85 Lump Sum for Each, Amt: 2478.85 8. Box Drainage Add sundries charges at 1 % on Material, Qty: 3053.55 Lump Sum for Each, Amt: 3053.55 9. Box Drainage Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution., Qty: 52531.13 Lump Sum for Each, Amt: 52531.13 10. Box Drainage Plasticizer / super plasticizer, Qty: 118.80 Kg, Amt: 7047.22 11. Box Drainage HOM of Vibrator 0.71 days, Qty: 2.81 Day, Amt: 475.16 12. Box Drainage Jungle wood runners and planks, Qty: 0.17 Cum, Amt: 5019.75 13. Box Drainage Silver oak or equivalent planks 38 mm thick, Qty: 2.11 Cum, Amt: 44633.47 14. Box Drainage Casurina poles 100 - 150 mm, Qty: 144.15 Mtr, Amt: 6841.30 15. Box Drainage Add Handling , loading and unloading at 2% on Material, Qty: 1289.90 Lump Sum for Each, Amt: 1289.90 16. Box Drainage Add sundries charges at 2 % on Material, Qty: 1289.90 Lump Sum for Each, Amt: 1289.90 17. Box Drainage TMT bars Fe 500, Qty: 1.50 Tonne, Amt: 106132.60 18. Box Drainage Binding wire, Qty: 14.00 Kg, Amt: 771.12