RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of Multi Arch Check Dam To The Nala Near Dambala Mahadevakka Wo Shivanadappa Field At Hiremallanakeri Village. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1008/CALL-2 and it is closing on 11-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
26-Feb-2024
Closing Date
11-Mar-2024
Tender Amount
522244.99
Construction Of Multi Arch Check Dam To The Nala Near Dambala Mahadevakka Wo Shivanadappa Field At Hiremallanakeri Village\Nworkcode 1505002001/Wc/Gis/1041303 1. Labour charges for lifting and placing in position and making connection at 7Percentage on Material mg, Qty: 1.54 Lump Sum for Each, Amt: 789.94 2. MG Add sundries charges at 2 Percentage on Material, Qty: 724.40 Lump Sum for Each, Amt: 724.40 3. Mathi perNandi wood planks for panels 25 mm thick mg, Qty: 0.21 Cum, Amt: 6157.56 4. Mathi perNandi wood scantling mg, Qty: 0.80 Cum, Amt: 17036.02 5. Rubber beading for shutters beading mg, Qty: 7.68 Mtr, Amt: 3087.36 6. Add Handling , loading and unloading at 2Percentage on Material mg, Qty: 724.40 Lump Sum for Each, Amt: 724.40 7. Plasticizer per super plasticizer mg, Qty: 139.13 Kg, Amt: 26574.60 8. Binding wire mg, Qty: 32.46 Kg, Amt: 1785.30 9. Boulders mg, Qty: 38.40 Cum, Amt: 25612.80 10. Casurina poles 100 150 mm mg, Qty: 173.75 Mtr, Amt: 8246.37 11. TMT bars Fe 500 mg, Qty: 3.49 Tonne, Amt: 209963.22 12. HOM of Vibrator 0.71 Days mg, Qty: 3.29 Day, Amt: 960.91 13. Add sundries charges at 1 Percentage on Material mg, Qty: 3509.65 Lump Sum for Each, Amt: 3509.65 14. Portland Cement mg, Qty: 17.45 Tonne, Amt: 102283.96 15. Coarse sand zone 3 mg, Qty: 29.61 Cum, Amt: 43704.81 16. Broken stone aggregate 12 mm to 10 mm size mg, Qty: 14.03 Cum, Amt: 19109.82 17. Broken stone aggregate 20 mm size mg, Qty: 24.14 Cum, Amt: 32180.09 18. Broken stone aggregate 40 mm size mg, Qty: 6.17 Cum, Amt: 7343.49 19. Mi.er concrete1 Cum Capacity mg, Qty: 4.32 Day, Amt: 10273.12 20. Add watering charges at 1 Percentage on Material mg, Qty: 2177.17 Lump Sum for Each, Amt: 2177.17