RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For Construction Of School Compound Wall At Hattigudda Village. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1743 and it is closing on 5-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
27-Feb-2024
Closing Date
5-Mar-2024
Tender Amount
534709.04
Supply Of Materials For Construction Of School Compound Wall At Hattigudda Village 1. Transportation loading and unloading at1Percentage on material KALM 02, Qty: 100.38 LS, Amt: 100.38 2. Tools and Plants at2Percentage on material KALM 02, Qty: 200.78 LS, Amt: 200.78 3. HOM of cutting and grinding machine - 1 KALM 02, Qty: 56.00 Hour, Amt: 10864.00 4. HOM of welding and grinding machine KALM 02, Qty: 3.50 Day, Amt: 4074.00 5. Mechanic Class II/Mechanic HmP Grade I/EME Grade KALM 02, Qty: 14.00 Day, Amt: 6992.02 6. Welder Grade I KALM 02, Qty: 7.00 Day, Amt: 3599.96 7. Anticorrosive bituminous paint (black) KALM 02, Qty: 5.25 Ltr, Amt: 525.00 8. Ball bearing hinges heavy duty KALM 02, Qty: 7.00 No, Amt: 1661.03 9. Cast iron spike KALM 02, Qty: 31.50 No, Amt: 2669.62 10. MS Plates 40 x 6 mm KALM 02, Qty: 47.30 Kg, Amt: 3784.20 11. MS Plates 36 mm x 6mm KALM 02, Qty: 88.39 Kg, Amt: 7071.40 12. MS Square rod 16 x 16 mm KALM 02, Qty: 99.45 Kg, Amt: 7956.19 13. MS Hollow pipe B Class 14 Gauge 50 mm dia KALM 02, Qty: 72.99 Kg, Amt: 3711.67 14. Vibratory Roller 8 Tonne KALM 02, Qty: 0.40 Hour, Amt: 802.00 15. Water Tanker KALM 02, Qty: 1.60 Hour, Amt: 1160.00 16. Laboratory Asst. (SSLC Passed)/Mate/Supervisor KALM 02, Qty: 0.02 Day, Amt: 8.23 17. Gravel 2.36 mm/Murrum KALM 02, Qty: 46.00 Cum, Amt: 13248.00 18. Water KALM 02, Qty: 9.60 K.Ltr, Amt: 9.60 19. Painter Class I KALM 02, Qty: 14.58 Day, Amt: 7498.15 20. Add Brush, putty, sand paper, roller at 5Percentage on cost of pain KALM 02t, Qty: 375.84 LS, Amt: 375.84 21. Plastic emulsion paint KALM 02, Qty: 32.67 Ltr, Amt: 9147.60 22. Add providing and removing scaffolding at 3Percentage on Labour KALM 02, Qty: 873.45 LS, Amt: 873.45 23. Add Handling , loading and unloading at 1Percentage on Material KALM 02, Qty: 81.14 LS, Amt: 81.14 24. Mason Class I (with tools) KALM 02, Qty: 33.82 Day, Amt: 17394.29 25. Mixer (concrete small used in culvert) KALM 02, Qty: 7.78 Hour, Amt: 2871.26 26. Solid concrete blocks (40x20x20 cms)-5.00 N Sqmm KALM 02, Qty: 1522.02 No, Amt: 71534.87