RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For Construction Of School Compound Wall At Kalmangi Village. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1745 and it is closing on 5-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
27-Feb-2024
Closing Date
5-Mar-2024
Tender Amount
661858.98
Supply Of Materials For Construction Of School Compound Wall At Kalmangi Village 1. Transportation loading and unloading at1percentage on material KALM 03, Qty: 95.60 LS, Amt: 95.60 2. Tools and Plants at2percentage on material KALM 03, Qty: 191.22 LS, Amt: 191.22 3. HOM of cutting and grinding machine - 1 KALM 03, Qty: 53.33 Hour, Amt: 10346.66 4. HOM of welding and grinding machine KALM 03, Qty: 3.33 Day, Amt: 3879.96 5. Mechanic Class II/Mechanic HmP Grade I/EME Grade KALM 03, Qty: 13.33 Day, Amt: 6659.05 6. Welder Grade I KALM 03, Qty: 6.67 Day, Amt: 3428.55 7. Anticorrosive bituminous paint (black) KALM 03, Qty: 5.00 Ltr, Amt: 500.00 8. Ball bearing hinges heavy duty KALM 03, Qty: 6.67 No, Amt: 1581.94 9. Cast iron spike KALM 03, Qty: 30.00 No, Amt: 2542.50 10. MS Plates 40 x 6 mm KALM 03, Qty: 45.05 Kg, Amt: 3604.00 11. MS Plates 36 mm x 6mm KALM 03, Qty: 84.18 Kg, Amt: 6734.66 12. MS Square rod 16 x 16 mm KALM 03, Qty: 94.72 Kg, Amt: 7577.33 13. MS Hollow pipe B Class 14 Gauge 50 mm dia KALM 03, Qty: 69.52 Kg, Amt: 3534.92 14. Vibratory Roller 8 Tonne KALM 03, Qty: 1.50 Hour, Amt: 3007.50 15. Water Tanker KALM 03, Qty: 6.00 Hour, Amt: 4350.00 16. Laboratory Asst. (SSLC Passed)/Mate/Supervisor KALM 03, Qty: 0.06 Day, Amt: 30.91 17. Gravel 2.36 mm/Murrum KALM 03, Qty: 172.50 Cum, Amt: 49680.00 18. Water KALM 03, Qty: 36.00 K.Ltr, Amt: 36.00 19. Painter Class I KALM 03, Qty: 18.47 Day, Amt: 9497.67 20. Add Brush, putty, sand paper, roller at 5percentage on cost of paint KALM 03, Qty: 476.06 LS, Amt: 476.06 21. Plastic emulsion paint KALM 03, Qty: 41.38 Ltr, Amt: 11586.96 22. Add providing and removing scaffolding at 3percentage on Labour KALM 03, Qty: 1106.37 LS, Amt: 1106.37 23. Add Handling , loading and unloading at 1percentage on Material KALM 03, Qty: 102.73 LS, Amt: 102.73 24. Mason Class I (with tools) KALM 03, Qty: 42.12 Day, Amt: 21660.34 25. Mixer (concrete small used in culvert) KALM 03, Qty: 9.80 Hour, Amt: 3617.71 26. Solid concrete blocks (40x20x20 cms)-5.00 N Sqmm KALM 03, Qty: 1895.30 No, Amt: 89079.23