RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Material For Road Work In Neralakere Village Akkanahalli Gp. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1203/CALL-2 and it is closing on 9-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
29-Feb-2024
Closing Date
9-Mar-2024
Tender Amount
779227.92
Tendor For Construction Material For Road Work In Neralakere Village Akkanahalli Gp 1. Granite metal 40 mm a, Qty: 38.17 Cum, Amt: 45422.30 2. Granite metal 20 mm a, Qty: 4.25 Cum, Amt: 5057.50 3. Crushed stone chippings 13.2mm a, Qty: 11.22 Cum, Amt: 14956.26 4. Gravel 2.36 mm Murrum a, Qty: 5.60 Cum, Amt: 1612.80 5. Vibratory Roller 8 T a, Qty: 1.17 hr, Amt: 2345.85 6. Water Tanker a, Qty: 4.67 hr, Amt: 3385.75 7. Form work 1 a, Qty: 1.00 Lump Sum for Each, Amt: 11349.00 8. Portland Cement a, Qty: 42.07 t, Amt: 246530.20 9. Coarse sand zone III a, Qty: 63.11 Cum, Amt: 93150.36 10. Broken stone aggregate 40 mm size a, Qty: 50.49 Cum, Amt: 60083.10 11. Broken granite metal 20 mm a, Qty: 50.49 Cum, Amt: 55106.31 12. Broken granite metal 10 mm a, Qty: 25.25 Cum, Amt: 34390.50 13. Polythene sheet 125 mm micron a, Qty: 701.25 Sqm, Amt: 8022.30 14. Bitumen primer 200 ml per joint for 23 joints a, Qty: 0.01 t, Amt: 635.35 15. De bonding strips 3.75 m length x 10 mm width x5mm thick cut out of rubberfiller board or similar materialincluding 5 wastage, Qty: 168.30 Cum, Amt: 27298.26 16. Plasticizer super plasticizer a, Qty: 228.60 Kg, Amt: 43662.60 17. Joint filler board 20mm thick asper IS1838 a, Qty: 5.60 Sqm, Amt: 949.15 18. Concrete mixer 0.4 0.28 cumcapacity, Qty: 67.30 hr, Amt: 24833.70 19. Needle Vibrator a, Qty: 16.83 hr, Amt: 6917.13 20. Plate Vibrator a, Qty: 16.83 hr, Amt: 6917.13 21. Concrete joint cutting machine for initial and final cuts a, Qty: 7.00 hr, Amt: 1358.00 22. Water tanker 6 kl capacity a, Qty: 9.80 hr, Amt: 7105.00 23. Air Compressor 1 hr initial 1 hr final a, Qty: 4.20 hr, Amt: 1923.60 24. The cost of all materials, centering, transportation, fixing, wastage and other extra charges etc, excluding the cost of Unskilled labor. a, Qty: 1.00 Lump Sum for Each, Amt: 4058.00 25. Laboratory Asst. SSLCPassed Mate Supervisor a, Qty: 3.97 Lump Sum for Each, Amt: 2041.70 26. Tractor 40 HP a, Qty: 15.61 hr, Amt: 10286.99 27. Bituminous sealant 800 ml perjoint 23 joints a, Qty: 35.00 l, Amt: 2432.15