RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Under Mgnrega Scheme - Construction Of Bharath Nirman Seva Kendra Building At Kudlur Gp, Tarikere Taluk, Chikkamagaluru. The project location is Chikkamagaluru, Karnataka, India. The reference number is RDPR/2023-24/IND0830/CALL-2 and it is closing on 11-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
2-Mar-2024
Closing Date
11-Mar-2024
Tender Amount
2188277.47
Under Mgnrega Scheme - Construction Of Bharath Nirman Seva Kendra Building At Kudlur Gp, Tarikere Taluk, Chikkamagaluru 1. Add sundries charges at 1 % on Material (KUD), Qty: 16202.69 LS, Amt: 16202.69 2. Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution. (KUD), Qty: 205144.58 LS, Amt: 205144.58 3. Broken stone aggregate 40 mm size (KUD), Qty: 14.07 Cum, Amt: 16749.58 4. Broken stone aggregate 20 mm size (KUD), Qty: 37.33 Cum, Amt: 48000.44 5. Broken stone aggregate 12 mm to 10 mm size (KUD), Qty: 23.45 Cum, Amt: 30148.23 6. Coarse sand (zone III) (KUD), Qty: 89.00 Cum, Amt: 149140.29 7. Portland Cement (KUD), Qty: 38.35 Tonne, Amt: 267711.62 8. Mixer (concrete) - 1 cum Capacity (KUD), Qty: 7.15 Day, Amt: 9699.47 9. Add watering charges at 1 % on Material (KUD), Qty: 7845.82 LS, Amt: 7845.82 10. Silver oak or equivalent planks 38 mm thick (KUD), Qty: 1.77 Cum, Amt: 37559.32 11. Jungle wood runners and planks (KUD), Qty: 0.55 Cum, Amt: 16130.13 12. Casurina Poles 75 - 100 mm dia (KUD), Qty: 6.58 Mtr, Amt: 245.29 13. Add Handling , loading and unloading at 2% on Material (KUD), Qty: 3479.53 LS, Amt: 3479.53 14. Casurina poles 100 - 150 mm (KUD), Qty: 234.09 m, Amt: 11109.90 15. Add sundries charges at 2 % on Material (KUD), Qty: 1385.68 LS, Amt: 1385.68 16. Plasticizer / super plasticizer (KUD), Qty: 203.10 Kg, Amt: 12047.87 17. HOM of Vibrator 0.71 days (KUD), Qty: 4.74 Day, Amt: 800.79 18. Boulders (KUD), Qty: 1.86 Cum, Amt: 1234.31 19. Size stone 20 x 20 x 25 cms (KUD), Qty: 4930.30 Each, Amt: 58473.33 20. Bond stone 20 x 20 x 45 cm (KUD), Qty: 270.68 Each, Amt: 7219.12 21. Mixer (concrete small used in culvert) (KUD), Qty: 36.44 Hour, Amt: 1530.32 22. Add Handling , loading and unloading at 1% on Material (KUD), Qty: 1173.28 LS, Amt: 1173.28 23. Add sundries charges at 1 % on Labour (KUD), Qty: 103.58 LS, Amt: 103.58 24. Add watering charges at 1 % on Labour (KUD), Qty: 103.58 LS, Amt: 103.58