RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Material To Construction Of Kitchen Shed Government Primary School Yagapur Village Of Yagapur Gp In Tq. Chittapur. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND2006 and it is closing on 9-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
2-Mar-2024
Closing Date
9-Mar-2024
Tender Amount
575750.36
Supply Of Material To Construction Of Kitchen Shed Government Primary School Yagapur Village Of Yagapur Gp In Tq. Chittapur 1. GP-ALLOLI-Name board, Qty: 1.00 No, Amt: 5226.00 2. GP-ALLOLI-GST, Qty: 1.00 Lump Sum for Each, Amt: 68880.00 3. GP-ALLOLI-Add White lead paint, gasket, cement, sand for making good the wall and floor at 2percent on Material, Qty: 37.74 Lump Sum for Each, Amt: 37.74 4. GP-ALLOLI-LicencedPlumberwithtools, Qty: 1.00 Day, Amt: 421.20 5. GP-ALLOLI-Lead or PVC connection pipe 32mm dia (for wash basin), Qty: 1.00 Each, Amt: 101.69 6. GP-ALLOLI-C.I./M.S.bracketsforflushingcistern, Qty: 2.00 Each, Amt: 110.18 7. GP-ALLOLI-Brassstopcock, Qty: 1.00 Each, Amt: 186.44 8. GP-ALLOLI-CP brasswaste32mmofstandardpattern, Qty: 1.00 Each, Amt: 161.02 9. GP-ALLOLI-CP brasschainwithplug, Qty: 1.00 Each, Amt: 110.17 10. GP-ALLOLI-Copperplatedbrasspillertap15mm, Qty: 1.00 Each, Amt: 211.86 11. GP-ALLOLI-White vitreous china clay flat back wash basin size 630x450mm, Qty: 1.00 Each, Amt: 779.66 12. GP-ALLOLI-Granitesink23cmthick, Qty: 0.54 Sqm, Amt: 4942.37 13. GP-ALLOLI-Vitrifiedtiles600x600mm, Qty: 30.72 Sqm, Amt: 17203.14 14. GP-ALLOLI-Whitecement, Qty: 0.02 Quintal, Amt: 26.88 15. GP-ALLOLI-Ceramictiles30x30cms, Qty: 18.89 Sqm, Amt: 4646.74 16. GP-ALLOLI-Lime, Qty: 0.42 Cum, Amt: 1604.74 17. GP-ALLOLI-AddBrush,putty,sandpaperat5percentoncostofpaint, Qty: 5.79 Lump Sum for Each, Amt: 5.79 18. GP-ALLOLI-Liquidwoodfiller, Qty: 0.53 Ltr, Amt: 98.16 19. GP-ALLOLI-Primer, Qty: 8.18 Kg, Amt: 728.02 20. GP-ALLOLI-AddBrush,putty,sandpaper,rollerat1percentoncostof paint, Qty: 6.55 Lump Sum for Each, Amt: 6.55 21. GP-ALLOLI-waterproofingcementpaint, Qty: 8.18 Kg, Amt: 589.34 22. GP-ALLOLI-AddBrush,putty,glueat5percentoncostofpaint, Qty: 55.75 Lump Sum for Each, Amt: 55.75 23. GP-ALLOLI-Whitening, Qty: 16.89 Kg, Amt: 314.88 24. GP-ALLOLI-Drydistemper, Qty: 16.89 Kg, Amt: 944.81 25. GP-ALLOLI-Add HOM of welding and grinding machine at 2percent on Material, Qty: 304.04 Lump Sum for Each, Amt: 304.04