RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of Lwm Unit At Kapgal Village Of Kapgal Gp Of Manvi Tq. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND2032 and it is closing on 10-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
3-Mar-2024
Closing Date
10-Mar-2024
Tender Amount
543582.89
Construction Of Lwm Unit At Kapgal Village Of Kapgal Gp Of Manvi Tq 1. CIB KP01, Qty: 5000.00 LS, Amt: 5000.00 2. Add Brush at 1percentage on cost of paint KP01, Qty: 1.60 LS, Amt: 1.60 3. Enamel metal paint KP01, Qty: 0.64 Ltr, Amt: 132.21 4. Add Wire brush, fine steel wool, putty, sand paper, at 3percentage on cost of paint KP01, Qty: 1.64 LS, Amt: 1.64 5. Ready mix primer paint (Ready mix red lead paint) KP01, Qty: 0.64 Ltr, Amt: 54.55 6. Add HOM of welding and grinding machine at 4percentage on Material KP01, Qty: 220.95 LS, Amt: 220.95 7. Welder Grade I KP01, Qty: 3.57 Day, Amt: 1833.77 8. Fitter Class I KP01, Qty: 3.57 Day, Amt: 1833.77 9. MS flat KP01, Qty: 91.57 Kg, Amt: 4505.25 10. M.S Rods KP01, Qty: 58.41 Kg, Amt: 4672.65 11. Painter Class I KP01, Qty: 10.75 Day, Amt: 5527.17 12. Add Brush, putty, sand paper at 2percentage on cost of paint KP01, Qty: 123.32 LS, Amt: 123.32 13. water proofing cement paint KP01, Qty: 77.08 Kg, Amt: 4393.33 14. Vibratory Roller 8 Tonne KP01, Qty: 0.93 Hour, Amt: 1862.24 15. Water Tanker KP01, Qty: 3.72 Hour, Amt: 2693.52 16. Motor Grader 3.35 meter blade KP01, Qty: 0.93 Hour, Amt: 4111.80 17. Wheeled Dozer (D50 BEML) KP01, Qty: 0.46 Hour, Amt: 1367.19 18. Gravel 2.36 mm/Murrum KP01, Qty: 106.81 Cum, Amt: 30761.86 19. Water KP01, Qty: 22.29 K.Ltr, Amt: 22.29 20. PVC pipe of 10kg cum 90 mm KP01, Qty: 30.00 Mtr, Amt: 10126.50 21. Laboratory Asst. (SSLC Passed)/Mate/Supervisor KP01, Qty: 3.75 Day, Amt: 1929.78 22. Spalls/blasted rubbles KP01, Qty: 18.58 Cum, Amt: 7467.55 23. PVC pipe of 6kg cum 90 mm KP01, Qty: 25.00 Mtr, Amt: 5240.75 24. Add providing and removing scaffolding at 3percentage on Labour KP01, Qty: 399.38 LS, Amt: 399.38 25. Jungle wood runners and planks KP01, Qty: 0.06 Cum, Amt: 1670.34 26. Add Handling , loading and unloading at 2percentage on Material KP01, Qty: 170.66 LS, Amt: 170.66 27. Silver oak or equivalent planks 38 mm thick KP01, Qty: 0.23 Cum, Amt: 4898.30 28. Binding wire KP01, Qty: 15.84 Kg, Amt: 871.20