RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For Construction Of Gray Water Mangaement Heera Gp Unit 01. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND2113 and it is closing on 13-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
5-Mar-2024
Closing Date
13-Mar-2024
Tender Amount
1242358.98
Supply Of Materials For Construction Of Gray Water Mangaement Heera Gp Unit 01 1. Plants and Display board, Qty: 1.00 LS, Amt: 45798.00 2. Vibratory Roller 8 Tonne Heer001, Qty: 0.47 Hour, Amt: 952.38 3. Water Tanker Heer001, Qty: 1.90 Hour, Amt: 1377.50 4. Motor Grader 3.35 meter blade Heer001, Qty: 0.47 Hour, Amt: 2102.83 5. Wheeled Dozer (D50 BEML) Heer001, Qty: 0.24 Hour, Amt: 699.20 6. Gravel 2.36 mm/Murrum Heer001, Qty: 54.62 Cum, Amt: 15732.00 7. PVC pipe of 4kg cum10 mm Heer001, Qty: 20.00 Mtr, Amt: 8170.00 8. Burnt bricks class 35 (non modular) Heer001, Qty: 1566.07 No, Amt: 12528.52 9. Stone Aggregate(single size)20 mm nominal size Heer001, Qty: 115.93 Cum, Amt: 154530.69 10. Laboratory Asst. (SSLC Passed)/Mate/Supervisor Heer001, Qty: 2.78 Day, Amt: 1429.18 11. Spalls/blasted rubbles Heer001, Qty: 13.80 Cum, Amt: 5547.60 12. Boulders Heer001, Qty: 69.00 Cum, Amt: 46023.00 13. PVC pipe of 4kg cum 160 mm Heer001, Qty: 40.00 Mtr, Amt: 34787.20 14. HOM of Vibrator 0.71 days Heer001, Qty: 0.75 Day, Amt: 219.09 15. Plasticizer / super plasticizer Heer001, Qty: 31.73 Kg, Amt: 6059.48 16. Add providing and removing scaffolding at 3percentage on Labour Heer001, Qty: 18.54 LS, Amt: 18.54 17. Add sundries charges at 2 percentage on Material Heer001, Qty: 2.34 LS, Amt: 2.34 18. Add Handling , loading and unloading at 1percentage on Material Heer001, Qty: 1.17 LS, Amt: 1.17 19. Casurina poles 100 - 150 mm Heer001, Qty: 2.09 Mtr, Amt: 99.12 20. Mixer (concrete small used in culvert) Heer001, Qty: 0.97 Hour, Amt: 358.63 21. Solid concrete blocks (40X10X20 cms)-4.00 N/Sqmm Heer001, Qty: 54.49 Each, Amt: 1852.80 22. Broken stone aggregate 40 mm size Heer001, Qty: 0.12 Cum, Amt: 142.09 23. Transportation loading and unloading at1percentage on material Heer001, Qty: 71.71 LS, Amt: 71.71 24. Tools and Plants at2percentage on material Heer001, Qty: 143.41 LS, Amt: 143.41 25. HOM of cutting and grinding machine - 1 Heer001, Qty: 40.00 Hour, Amt: 7760.00 26. HOM of welding and grinding machine Heer001, Qty: 2.50 Day, Amt: 2910.00