RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Ramtheertha Inline. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND2131 and it is closing on 12-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
5-Mar-2024
Closing Date
12-Mar-2024
Tender Amount
79673.84
Supply Of Materials For Construction Of Inline Treatment At Ramtheertha Village Of Bhimanalli Gram Panchayat 1. RAMTINLINE-Transportationloadingandunloading at 1 Percent on material, Qty: 1264.00 Lump Sum for Each, Amt: 1264.00 2. RAMTINLINE-Toolsand Plants at 2 Percent onmaterial, Qty: 47.80 Lump Sum for Each, Amt: 47.80 3. RAMTINLINE-HOMofcuttingandgrindingmachine-1, Qty: 13.33 Hour, Amt: 13.33 4. RAMTINLINE-HOMofweldingandgrindingmachine, Qty: 0.83 Day, Amt: 0.83 5. RAMTINLINE-Mechanic Class II/Mechanic HmPGrade I/EME Grade, Qty: 7.88 Day, Amt: 7.88 6. RAMTINLINE-WelderGradeI, Qty: 1.67 Day, Amt: 1.67 7. RAMTINLINE-Anticorrosivebituminouspaint(black), Qty: 1.25 Ltr, Amt: 1.25 8. RAMTINLINE-Ballbearinghingesheavyduty, Qty: 1.67 No, Amt: 1.67 9. RAMTINLINE-Castironspike, Qty: 7.50 No, Amt: 7.50 10. RAMTINLINE-40x6mmMSPlates, Qty: 11.26 Kg, Amt: 11.26 11. RAMTINLINE-36mmx6mmMSPlates, Qty: 21.05 Kg, Amt: 21.05 12. RAMTINLINE-16x16mmMSSquarerod, Qty: 23.68 Kg, Amt: 23.68 13. RAMTINLINE-50mmdiaMSHollowpipeBClass14Gauge, Qty: 17.38 Kg, Amt: 17.38 14. RAMTINLINE-Add Gum / gangiwater / fevical and blue at 10 Percent of lime cost, Qty: 23.33 Lump Sum for Each, Amt: 23.33 15. RAMTINLINE-Burntlime/shelllime, Qty: 0.52 Quintal, Amt: 0.52 16. RAMTINLINE-Add providing and removing scaffolding at 3 Percent on Labour, Qty: 382.41 Lump Sum for Each, Amt: 382.41 17. RAMTINLINE-Addsundrieschargesat2 Percent onMaterial, Qty: 190.77 Lump Sum for Each, Amt: 190.77 18. RAMTINLINE-Add Handling , loading and unloading at 1 Percent on Material, Qty: 97.98 Lump Sum for Each, Amt: 97.98 19. RAMTINLINE-Casurinapoles100-150mm, Qty: 110.16 Mtr, Amt: 110.16 20. RAMTINLINE-StoneChistlerClassII, Qty: 38.88 Day, Amt: 38.88 21. RAMTINLINE-MasonClassI(withtools), Qty: 38.88 Day, Amt: 38.88 22. RAMTINLINE-Boulders, Qty: 3.11 Cum, Amt: 3.11 23. RAMTINLINE-Sizestone20x20x25cms, Qty: 8262.00 Each, Amt: 8262.00 24. RAMTINLINE-Mixer(concretesmallusedinculvert), Qty: 28.94 Hour, Amt: 28.94 25. RAMTINLINE-Bondstone20x20x45cm, Qty: 596.16 Each, Amt: 596.16