PUBLIC HEALTH ENGINEERING DEPARTMENT (PHED), GOVT OF CHHATTISGARH has floated a e tender for Construction of Tubewell {Drilling of 400/ 200 Mm Dia Gravel Packed Cum Telescopic Tw}, Rising Main {Providing, Laying & Jointing of 80-150 Mm Dia Di Class K-9 Pipe}, Pumps on Tw's {Providing & Instal.... The project location is Bilaspur, Chhattisgarh, India. The reference number is 153975 and it is closing on 3-Apr-2024. Find more about this online tender from below to Submit your bid.
Posting Date
12-Mar-2024
Closing Date
3-Apr-2024
Tender Amount
48478000.00
Construction Of Tubewell {Drilling Of 400/ 200 Mm Dia Gravel Packed Cum Telescopic Tw}, Rising Main {Providing, Laying & Jointing Of 80-150 Mm Dia Di Class K-9 Pipe}, Pumps On Tw's {Providing & Installation Of Suitable Submersible Pump Including All Accessories Etc Complete} Switch Room, Construction Of Rcc Sump Well-03 Nos., Disinfection System {Proposed To Provide Electro Chlorination System}, Clear Water Pumps {Providing & Installation Of Suitable Centrifugal Pumps Including All Accessories Etc Complete I/C Standby}, Clear Water Conveyance Main {Providing, Laying & Jointing Of 80 - 200 Mm Dia Di Class K-7}, Storage {Construction Of 450 Kl @ 30 M & 150 Kl @ 33 M Staging Capacity Rcc Elevated Reservoir}, Water Distribution Network {Providing, Laying & Jointing Of Distribution System 63-200 Mm Dia Pe Grade 100 Class Pn6}, House Connections {Providing, Laying & Jointing Of House Connections To Proposed Houses - 210 Nos.}, Power {Providing And Installation Of The Outdoor Transformer Of 100 Kva & 63 Kva Including 100% Standby Arrangement}, Source Sustainability Structure {Existing Defunct Tw's Are Proposed To Be Used As Pit Recharge Structure As Pit}, Sensor Based Measurement & Monitoring System Using Iot {Providing Installation, Testing, Commissioning & Transportation At Site Of Sensor Based Measurement & Monitoring System With 5 Years Amc And Performance Guarantee} Complete Including Testing Of Entire Scheme For 03 Months. After Completion Of All Components Of The Scheme Including Chemicals, Staff And Trial Run Of Entire Scheme For 09 Months With Defectliabilities Period Of 1 Year At Hon. High Court, Bilaspur (C.G.)