RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For The Construction Of Gwm Unit At Jalapur Village Of Chagabhavi Gp Under Mgnregs Scheme. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND2428 and it is closing on 19-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
12-Mar-2024
Closing Date
19-Mar-2024
Tender Amount
917101.37
Supply Of Materials For The Construction Of Gwm Unit At Jalapur Village Of Chagabhavi Gp Under Mgnregs Scheme 1. Display board and plants, Qty: 1.00 LS, Amt: 42503.00 2. Vibratory Roller 8 Tonne cha001, Qty: 0.47 Hour, Amt: 952.38 3. Water Tanker cha001, Qty: 1.90 Hour, Amt: 1377.50 4. Motor Grader 3.35 meter blade cha001, Qty: 0.47 Hour, Amt: 2102.83 5. Wheeled Dozer (D50 BEML) cha001, Qty: 0.24 Hour, Amt: 699.20 6. Gravel 2.36 mm/Murrum cha001, Qty: 54.62 Cum, Amt: 15732.00 7. PVC pipe of 4kg cum110 mm cha001, Qty: 10.00 Mtr, Amt: 4085.00 8. Add sundries charges at 2 percentage on Material cha001, Qty: 1.10 LS, Amt: 1.10 9. Add Handling , loading and unloading at 1percentage on Material cha001, Qty: 0.55 LS, Amt: 0.55 10. Casurina poles 100 - 150 mm cha001, Qty: 0.98 Mtr, Amt: 46.64 11. Mixer (concrete small used in culvert) cha001, Qty: 0.78 Hour, Amt: 285.98 12. Burnt bricks class 35 (non modular) cha001, Qty: 1566.07 No, Amt: 12528.52 13. Stone Aggregate(single size)20 mm nominal size cha001, Qty: 115.93 Cum, Amt: 154530.69 14. Laboratory Asst. (SSLC Passed)/Mate/Supervisor cha001, Qty: 3.62 Day, Amt: 1861.18 15. Spalls/blasted rubbles cha001, Qty: 18.00 Cum, Amt: 7236.00 16. Boulders cha001, Qty: 90.00 Cum, Amt: 60030.00 17. PVC pipe of 4kg cum160 mm, Qty: 10.00 Mtr, Amt: 8696.80 18. HOM of Vibrator 0.71 days cha001, Qty: 0.74 Day, Amt: 215.71 19. Plasticizer / super plasticizer cha001, Qty: 31.23 Kg, Amt: 5965.50 20. Broken stone aggregate 40 mm size cha001, Qty: 0.28 Cum, Amt: 327.73 21. Transportation loading and unloading at1percentage on material cha001, Qty: 25.81 LS, Amt: 25.81 22. Tools and Plants at2percentage on material cha001, Qty: 51.63 LS, Amt: 51.63 23. HOM of cutting and grinding machine - 1 cha001, Qty: 14.40 Hour, Amt: 2793.60 24. HOM of welding and grinding machine cha001, Qty: 0.90 Day, Amt: 1047.60 25. Mechanic Class II/Mechanic HmP Grade I/EME Grade cha001, Qty: 3.60 Day, Amt: 1797.95 26. Welder Grade I cha001, Qty: 1.80 Day, Amt: 925.70 27. Anticorrosive bituminous paint (black) cha001, Qty: 1.35 Ltr, Amt: 135.00