RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of School Compound At Didaga Gp. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND2430 and it is closing on 22-Mar-2024. Find more about this online tender from below to Submit your bid.
Posting Date
15-Mar-2024
Closing Date
22-Mar-2024
Tender Amount
476505.63
Supply Material For Construction Of School Compound At Didaga Gp 1. Mixer (concrete small used in culvert)001, Qty: 36.10 hr, Amt: 13320.54 2. Rubble stones 261, Qty: 67.60 Cum, Amt: 32190.45 3. Portland Cement MATMAR50, Qty: 13.14 Tonne, Amt: 77000.40 4. Name Board MATMAR50, Qty: 1.00 No, Amt: 4828.00 5. Transportation loading and unloading at1Percent on material MATMAR50, Qty: 1.00 LS, Amt: 28.00 6. Tools and Plants at2Percent on material MATMAR50, Qty: 1.00 LS, Amt: 57.00 7. HOM of cutting and grinding machine - 1 MATMAR50, Qty: 16.00 Hour, Amt: 3104.00 8. HOM of welding and grinding machine MATMAR50, Qty: 1.00 Day, Amt: 1164.00 9. Mechanic Class IIMechanic HmP Grade IEME Grade MATMAR50, Qty: 4.00 Day, Amt: 1997.72 10. Welder Grade I MATMAR50, Qty: 2.00 Day, Amt: 1028.56 11. Anticorrosive bituminous paint black MATMAR50, Qty: 1.50 Ltr, Amt: 150.00 12. Ball bearing hinges heavy duty MATMAR50, Qty: 2.00 No, Amt: 474.58 13. Cast iron spike MATMAR50, Qty: 9.00 No, Amt: 762.75 14. MS Plates 40 x 6 mm MATMAR50, Qty: 13.51 Kg, Amt: 1080.80 15. MS Plates 36 mm x 6mm MATMAR50, Qty: 25.25 Kg, Amt: 2020.00 16. MS Square rod 16 x 16 mm MATMAR50, Qty: 28.41 Kg, Amt: 2272.80 17. MS Hollow pipe 50 mm dia B Class 14 Gauge MATMAR50, Qty: 20.85 Kg, Amt: 1060.23 18. Add providing and removing scaffolding at 3% on Labour001, Qty: 1.00 Lump Sum for Each, Amt: 409.00 19. Painter Class I 001, Qty: 17.91 Day, Amt: 9210.76 20. Add Brush, putty, glue at 5% on cost of paintmatt0191, Qty: 1.00 Kg, Amt: 215.00 21. water proofing cement paint 0012, Qty: 134.40 Kg, Amt: 7660.80 22. Solid Concrete Block (401520 cms)- 5.00 N/sqmm, Qty: 2589.00 Sqm, Amt: 108738.00 23. Add sundries charges at 2 % on Material01, Qty: 1.00 Lump Sum for Each, Amt: 50.00 24. Add Handling , loading and unloading at 1% on Material001, Qty: 1.00 Lump Sum for Each, Amt: 134.00 25. Casurina poles 100 - 150 mm001, Qty: 31.48 m, Amt: 1494.05 26. Stone Chistler Class II001, Qty: 8.64 Day, Amt: 4315.08