RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of School Compound Kallur. The project location is Koppa, Karnataka, India. The reference number is RDPR/2024-25/IND2682 and it is closing on 19-Jun-2024. Find more about this online tender from below to Submit your bid.
Posting Date
15-Jun-2024
Closing Date
19-Jun-2024
Tender Amount
514075.86
Construction Of School Compound Kallur 1. Casuarina poles 100 150MM, Qty: 47.46 Millimeter, Amt: 186.52 2. NEO25-Painter Class I, Qty: 436.00 Day, Amt: 7211.44 3. NEO1-Broken stone aggregate 20 mm size, Qty: 11.72 Cum, Amt: 15068.53 4. NEO24-Add Brush, putty, sand paper, roller at 5% on cost of paint, Qty: 946.98 Lump Sum for Each, Amt: 946.98 5. NEO23-Plastic emulsion paint, Qty: 200.00 K.Ltr, Amt: 7414.00 6. NEO22-Add providing and removing scaffolding at 3% on Labour, Qty: 91.67 Lump Sum for Each, Amt: 91.67 7. NEO21-Add sundries charges at 2 % on Material, Qty: 3.93 Lump Sum for Each, Amt: 186.52 8. NEO20-Add Handling , loading and unloading at 1% on Material, Qty: 1453.17 Lump Sum for Each, Amt: 62486.31 9. NEO19-Binding wire, Qty: 15.89 Kg, Amt: 875.23 10. NEO18-TMT bars Fe 500, Qty: 1.71 Tonne, Amt: 102782.40 11. NEO17-HOM of Vibrator 0.71 days, Qty: 1.41 Day, Amt: 238.29 12. NEO16-Plasticizer / super plasticizer, Qty: 59.59 Kg, Amt: 3534.88 13. NEO15-Stone Chistler Class II, Qty: 11.99 Day, Amt: 5050.19 14. NEO14-Mason Class II (with tools), Qty: 26.65 Day, Amt: 11224.98 15. NEO13-Mason Class I (with tools), Qty: 52.28 Day, Amt: 22804.54 16. NEO12-Mixer (concrete small used in culvert), Qty: 17.35 Hour, Amt: 728.70 17. NEO11-Boulders, Qty: 1.51 Cum, Amt: 1004.15 18. NEO10-Bond stone 20 x 20 x 45 cm, Qty: 213.18 Each, Amt: 5685.52 19. NEO9-Size stone 20 x 20 x 25 cms, Qty: 3760.57 Each, Amt: 44600.37 20. NEO8-Over Head & other Miscellaneous Charges, Qty: 52317.07 Lump Sum for Each, Amt: 52317.07 21. NEO7-Add sundries charges at 1 % on Material, Qty: 4647.38 Lump Sum for Each, Amt: 4647.38 22. NEO6-Add watering charges at 1 % on Material, Qty: 3170.84 Lump Sum for Each, Amt: 3170.84 23. NEO5-Mixer (concrete) 1 cum capacity, Qty: 2.27 Day, Amt: 3078.12 24. NEO4-Portland Cement, Qty: 14.84 Tonne, Amt: 86962.40 25. NEO3-Coarse sand (zone III), Qty: 33.33 Cum, Amt: 55860.79 26. NEO2-Broken stone aggregate 12 mm to 10 mm size, Qty: 7.38 Cum, Amt: 9489.44