RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Tender Notification For The Supply Of Materials For The Construction Of Nrlm Work Shed Under Mgnregs Scheme At Varlakonda Grama Panchayath.. The project location is Gudibanda, Karnataka, India. The reference number is RDPR/2023-24/IND2476/CALL-2 and it is closing on 21-Jun-2024. Find more about this online tender from below to Submit your bid.
Posting Date
15-Jun-2024
Closing Date
21-Jun-2024
Tender Amount
632623.00
Tender Notification For The Supply Of Materials For The Construction Of Nrlm Work Shed Under Mgnregs Scheme At Varlakonda Grama Panchayath. 1. Broken stone aggregate 20 mm size VRGP, Qty: 8.43 Cum, Amt: 11799.47 2. Broken stone aggregate 12 mm to 10 mm size VKGP, Qty: 4.38 Cum, Amt: 6267.13 3. Coarse sand zone III VKGP, Qty: 17.91 Cum, Amt: 27761.26 4. Portland Cement VKGP, Qty: 9.63 Tonne, Amt: 72263.46 5. Plasticizer / super plasticizer VKGP, Qty: 55.71 Kg, Amt: 12555.24 6. Mixer concrete 1 cum Capacity VKGP, Qty: 1.32 Day, Amt: 3132.52 7. HOM of Vibrator 0.71 days VKGP, Qty: 1.32 Day, Amt: 384.72 8. watering charges at 1 percent on Material VKGP, Qty: 1845.74 Lump Sum for Each, Amt: 1845.74 9. sundries charges at 1 VKGP percent on Material VKGP, Qty: 4028.53 Lump Sum for Each, Amt: 4028.53 10. TMT bars Fe 500 VKGP, Qty: 2.00 Tonne, Amt: 141816.60 11. Binding wire VKGP, Qty: 18.58 Kg, Amt: 1205.84 12. Silver oak or equivalent planks 38 mm thick VKGP, Qty: 0.44 Cum, Amt: 11022.50 13. Casurina poles 100 - 150 mm VKGP, Qty: 70.67 Mtr, Amt: 3957.67 14. Add Handling , loading and unloading at 2percent on Material VKGP, Qty: 1414.65 Lump Sum for Each, Amt: 1414.65 15. sundries charges at 2 percent on Material VKGP, Qty: 475.55 Lump Sum for Each, Amt: 475.55 16. Jungle wood runners and planks VKGP, Qty: 0.09 Cum, Amt: 2517.15 17. Brick VKGP, Qty: 9350.32 No, Amt: 78542.65 18. Mixer concrete small used in culvert VKGP, Qty: 8.69 Hour, Amt: 3205.80 19. Add Handling , loading and unloading at 1percent on Material VKGP, Qty: 175.33 Lump Sum for Each, Amt: 175.33 20. Add providing and removing scaffolding at 3 percent on Labour VKGP, Qty: 748.83 Lump Sum for Each, Amt: 748.83 21. Vitrified tiles 600x600 mm VKGP, Qty: 35.33 Sqm, Amt: 25849.99 22. Mason Class I with tools VKGP, Qty: 22.54 Day, Amt: 11593.67 23. Mathi/Nandi wood planks for panels 25 mm thick VKGP, Qty: 0.44 Cum, Amt: 46157.94 24. Add cutting and other wastage 5 percent VKGP, Qty: 2233.76 Lump Sum for Each, Amt: 2233.76 25. HOM of Machinaries for planing VKGP, Qty: 0.80 Cum, Amt: 27.27