RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Nrlm Work Shed Construction Materials To Harohalli Gp Mysuru. The project location is Mysuru, Karnataka, India. The reference number is RDPR/2024-25/IND2835 and it is closing on 8-Jul-2024. Find more about this online tender from below to Submit your bid.
Posting Date
26-Jun-2024
Closing Date
8-Jul-2024
Tender Amount
1140086.23
Supply Of Nrlm Work Shed Construction Materials To Harohalli Gp Mysuru 1. The cost of all materials, centering, transportation, fixing, wastage and other extra charges etc, excluding the cost of Unskilled labour. MYSTP, Qty: 1.00 Lump Sum for Each, Amt: 4058.78 2. Broken granite metal 20 mm MYSTP, Qty: 1.36 Cum, Amt: 1479.32 3. Plate vibrator having 3 Ton compaction force MYSTP, Qty: 1.98 Day, Amt: 502.92 4. Cobble stones of 75mm thick MYSTP, Qty: 69.30 Sqm, Amt: 32537.74 5. Blacksmith assistant MYSTP, Qty: 3.75 Day, Amt: 1579.50 6. Add 5% cost of material for riveting,bolting and welding accessories MYSTP, Qty: 820.80 Lump Sum for Each, Amt: 820.80 7. Water MYSTP, Qty: 45.00 kl, Amt: 1800.00 8. Tractor - 40 HP MYSTP, Qty: 0.60 Hour, Amt: 97.41 9. Water Tanker MYSTP, Qty: 7.75 Hour, Amt: 403.00 10. Laboratory Asst. (SSLC Passed)/Mate/Supervisor MYSTP, Qty: 0.82 Day, Amt: 372.24 11. Fine grass MYSTP, Qty: 50.00 Kg, Amt: 296.50 12. Sludge/Farm yard manure at 0.18 cum per 100 sqm MYSTP, Qty: 0.09 Cum, Amt: 15.30 13. Add MYSTP, Qty: 480.00 Each, Amt: 480.00 14. PVC pipe of 10kg cum,90 mm MYSTP, Qty: 20.00 Mtr, Amt: 6751.00 15. RCC Cap 1000 mm dia, 100 mm thick MYSTP, Qty: 1.00 Each, Amt: 750.00 16. Labour charges for handing errection of RCC rings etc. at 5percent MYSTP, Qty: 121.05 Lump Sum for Each, Amt: 121.05 17. Transportation charges of materials beyond 5 KM at 10percent MYSTP, Qty: 242.10 Lump Sum for Each, Amt: 242.10 18. Fabrication charges. MYSTP, Qty: 21.00 Kg, Amt: 231.00 19. Cost of 6.5mm M.S. Coil MYSTP, Qty: 21.00 Kg, Amt: 711.69 20. Charcoal MYSTP, Qty: 5.00 Kg, Amt: 150.00 21. Handling loading and unloading 3% on Material MYSTP, Qty: 189.00 Lump Sum for Each, Amt: 189.00 22. Labour charges for lifting and placing in position and making connection at 7% on Material MYSTP, Qty: 441.00 Lump Sum for Each, Amt: 441.00 23. Polyenthylene water storage tank of specified capacity L MYSTP, Qty: 1000.00 Ltr, Amt: 5080.00 24. Granite sink 23cm thick MYSTP, Qty: 0.54 Sqm, Amt: 4942.37