RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For Construction Of Lwm Work Near Komarappa Kuntoji Field At Bassapur Villages. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1730/CALL-2 and it is closing on 24-Jul-2024. Find more about this online tender from below to Submit your bid.
Posting Date
17-Jul-2024
Closing Date
24-Jul-2024
Tender Amount
664774.17
Supply Of Materials For Construction Of Lwm Work Near Komarappa Kuntoji Field At Bassapur Villages 1. Add sundries charges at 1 percentage on Material BP001, Qty: 3915.93 LS, Amt: 3915.93 2. Broken stone aggregate 20 mm size BP001, Qty: 24.03 Cum, Amt: 32032.12 3. Broken stone aggregate 12 mm to 10 mm size BP001, Qty: 12.28 Cum, Amt: 16730.81 4. Coarse sand (zone III) BP001, Qty: 29.20 Cum, Amt: 43098.31 5. Portland Cement BP001, Qty: 14.65 Tonne, Amt: 85839.62 6. Mixer (concrete) - 1 cum Capacity BP001, Qty: 3.35 Day, Amt: 7963.40 7. Add watering charges at 1 percentage on Material BP001, Qty: 2359.72 LS, Amt: 2359.72 8. Plasticizer / super plasticizer BP001, Qty: 71.55 Kg, Amt: 13666.05 9. HOM of Vibrator 0.71 days BP001, Qty: 1.69 Day, Amt: 494.15 10. M.S Rods BP001, Qty: 26.49 Kg, Amt: 2119.51 11. MS flat BP001, Qty: 41.54 Kg, Amt: 2043.58 12. Fitter Class I BP001, Qty: 1.62 Day, Amt: 831.80 13. Welder Grade I BP001, Qty: 1.62 Day, Amt: 831.80 14. Add HOM of welding and grinding machine at 4percentage on Material BP001, Qty: 100.22 LS, Amt: 100.22 15. Add Handling , loading and unloading at 1percentage on Material BP001, Qty: 50.81 LS, Amt: 50.81 16. Ready mix primer paint (Ready mix red lead paint) BP001, Qty: 0.29 Ltr, Amt: 24.74 17. Add Wire brush, fine steel wool, putty, sand paper, at 3percentage on cost of paintBP001, Qty: 0.74 LS, Amt: 0.74 18. Painter Class I BP001, Qty: 4.58 Day, Amt: 2354.94 19. Add providing and removing scaffolding at 3percentage on Labour BP001, Qty: 306.27 LS, Amt: 306.27 20. Add Handling , loading and unloading at 2percentage on Material BP001, Qty: 682.95 LS, Amt: 682.95 21. Enamel metal paint BP001, Qty: 0.29 Ltr, Amt: 59.97 22. Add Brush at 1percentage on cost of paint BP001, Qty: 0.73 LS, Amt: 0.73 23. TMT bars Fe 500 BP001, Qty: 2.31 Tonne, Amt: 138872.36 24. Binding wire BP001, Qty: 21.47 Kg, Amt: 1180.85 25. Jungle wood runners and planks BP001, Qty: 0.19 Cum, Amt: 5534.82 26. Silver oak or equivalent planks 38 mm thick BP001, Qty: 0.76 Cum, Amt: 16161.02