RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of School Compound At Vala Ballary Village Vala Ballary Gp. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1770/CALL-2 and it is closing on 1-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
18-Jul-2024
Closing Date
1-Aug-2024
Tender Amount
647003.12
Construction Of School Compound At Vala Ballary Village Vala Ballary Gp 1. Granite or trap broken metal 100 mm and down size.vvvv, Qty: 34.88 Cum, Amt: 34452.14 2. Coarse sand zone III.vvvv, Qty: 49.88 Cum, Amt: 83582.38 3. Add sundries charges at 1 percentage on Material.vvvv, Qty: 5178.96 LS, Amt: 5178.96 4. Add watering charges at 1 percentage on Material.vvvv, Qty: 3610.30 LS, Amt: 3610.30 5. Over Head & other Miscellaneous Charges.vvvv, Qty: 66098.27 LS, Amt: 66098.27 6. Broken stone aggregate 40 mm size.vvvv, Qty: 7.78 Cum, Amt: 9260.86 7. Broken stone aggregate 20 mm size.vvvv, Qty: 16.97 Cum, Amt: 21814.77 8. Broken stone aggregate 12 mm to 10 mm size.vvvv, Qty: 10.69 Cum, Amt: 13741.15 9. Portland Cement.vvvv, Qty: 17.54 Tonne, Amt: 102772.09 10. Mixer concrete 1 cum Capacity.vvvv, Qty: 3.28 Day, Amt: 4452.56 11. Plasticizer or super plasticizer.vvvv, Qty: 86.42 Kg, Amt: 5126.14 12. HOM of Vibrator 0.71 days.vvvv, Qty: 2.05 Day, Amt: 345.62 13. Silver oak or equivalent planks 38 mm thick.vvvv, Qty: 0.89 Cum, Amt: 18817.80 14. Casurina poles 100 150 mm.vvvv, Qty: 67.10 Mtr, Amt: 3184.54 15. Add Handling loading and unloading at 2 percentage on Material.vvvv, Qty: 495.38 LS, Amt: 495.38 16. Add sundries charges at 2 percentage on Material.vvvv, Qty: 501.17 LS, Amt: 501.17 17. TMT bars Fe 500.vvvv, Qty: 2.42 Tonne, Amt: 145340.64 18. Binding wire .vvvv, Qty: 22.47 Kg, Amt: 1237.65 19. Solid concrete blocks 40x20x20 cms 5.00 N or Sqmm.vvvv, Qty: 1912.01 No, Amt: 82216.64 20. Mixer concrete small used in culvert.vvvv, Qty: 10.35 hr, Amt: 434.70 21. Mason Class I with tools.vvvv, Qty: 42.49 Day, Amt: 18533.75 22. Add Handling loading and unloading at 1 percentage on Material.vvvv, Qty: 110.41 LS, Amt: 110.41 23. Add providing and removing scaffolding at 3 percentage on Labour.vvvv, Qty: 1191.19 LS, Amt: 1191.19 24. Plastic emulsion paint.vvvv, Qty: 44.55 Ltr, Amt: 8910.92 25. Add Brush putty sand paper roller at 5 percentage on cost of paint.vvvv, Qty: 512.56 LS, Amt: 512.56