RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of School Compound At Siddarampur Village Chennalli Gp. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1841/CALL-2 and it is closing on 1-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
18-Jul-2024
Closing Date
1-Aug-2024
Tender Amount
806520.43
Construction Of School Compound At Siddarampur Village Chennalli Gp 1. Add sundries charges at 1 percentage on Material 835132, Qty: 7060.96 LS, Amt: 7060.96 2. Granite ortrap broken metal 100 mm and down size 835132, Qty: 7.55 Cum, Amt: 8635.37 3. Coarse sand zone III 835132, Qty: 46.67 Cum, Amt: 68887.87 4. Add watering charges at 1 percentage on Material 835132, Qty: 4604.35 LS, Amt: 4604.35 5. Broken stone aggregate 40 mm size 835132, Qty: 6.84 Cum, Amt: 8135.20 6. Broken stone aggregate 20 mm size 835132, Qty: 18.17 Cum, Amt: 24221.68 7. Broken stone aggregate 12 mm to 10 mm size 835132, Qty: 11.09 Cum, Amt: 15100.36 8. Portland Cement 835132, Qty: 22.27 Tonne, Amt: 130474.07 9. Mixer concrete 1 cum Capacity 835132, Qty: 3.40 Day, Amt: 8067.47 10. Plasticizer or super plasticizer 835132, Qty: 97.48 Kg, Amt: 18619.64 11. HOM of Vibrator 0.71 days 835132, Qty: 2.31 Day, Amt: 673.26 12. TMT bars Fe 500 835132, Qty: 3.14 Tonne, Amt: 189198.55 13. Binding wire 835132, Qty: 29.25 Kg, Amt: 1608.75 14. Silver oak or equivalent planks 38 mm thick 835132, Qty: 1.28 Cum, Amt: 27199.15 15. Casurina poles 100 150 mm 835132, Qty: 91.63 Mtr, Amt: 4348.64 16. Add Handling loading and unloading at 2 percentage on Material 835132, Qty: 720.82 LS, Amt: 720.82 17. Add sundries charges at 2 percentage on Material 835132, Qty: 731.23 LS, Amt: 731.23 18. Casurina Poles 75 100 mm dia 835132, Qty: 14.39 Mtr, Amt: 536.64 19. Solid concrete blocks 40x20x20 cms 5.00 N per Sqmm 835132, Qty: 3434.21 No, Amt: 161408.08 20. Mixer concrete small used in culvert 835132, Qty: 19.46 hr, Amt: 7179.74 21. Mason Class I with tools 835132, Qty: 76.32 Day, Amt: 39247.74 22. Add Handling loading and unloading at 1 percentage on Material 835132, Qty: 177.97 LS, Amt: 177.97 23. Add providing and removing scaffolding at 3 percentage on Labour 835132, Qty: 2339.79 LS, Amt: 2339.79 24. water proofing cement paint 835132, Qty: 211.55 Kg, Amt: 12058.58 25. Add Brush putty sand paper at 2 percentage on cost of paint 835132, Qty: 338.49 LS, Amt: 338.49