RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For The Construction Of Rajeev Gandhi Seva Kendra Beside Community Health Center Main Road, Karkeshwara Gp, Nr Pura Taluk, Chikkamagaluru Dist. The project location is Narasimharajapura, Karnataka, India. The reference number is RDPR/2024-25/IND3350 and it is closing on 5-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
22-Jul-2024
Closing Date
5-Aug-2024
Tender Amount
2024171.40
Supply Of Materials For The Construction Of Rajeev Gandhi Seva Kendra Beside Community Health Center Main Road, Karkeshwara Gp, Nr Pura Taluk, Chikkamagaluru Dist 1. Adhesive for joints (KARK), Qty: 3.95 Kg, Amt: 252.67 2. High bond tile adhesive for vitrified tiles (KARK), Qty: 19.74 Kg, Amt: 414.54 3. Vitrified tiles 600X600 mm (KARK), Qty: 20.73 Sqm, Amt: 7896.99 4. Unit Cost as per the Specification (KARK), Qty: 7936.00 Each, Amt: 7936.00 5. Enamel paint (KARK), Qty: 1.10 Ltr, Amt: 229.32 6. Add Brush, putty, sand paper at 5% on cost of paint (KARK), Qty: 3.31 LS, Amt: 3.31 7. Enamel primer (KARK), Qty: 0.66 Ltr, Amt: 103.86 8. Add Brush, putty, sand paper, roller at 5% on cost of paint (KARK), Qty: 624.23 LS, Amt: 624.23 9. Plastic emulsion paint (KARK), Qty: 53.06 Ltr, Amt: 10347.34 10. Add Brush, putty, sand paper at 2% on cost of paint (KARK), Qty: 140.00 LS, Amt: 140.00 11. water proofing cement paint (KARK), Qty: 87.50 Kg, Amt: 6299.86 12. White cement (KARK), Qty: 0.00 Quintal, Amt: 7.50 13. Ceramic tiles of size 30 X 30 cms (KARK), Qty: 5.28 Sqm, Amt: 1568.16 14. Add White cement for pointing at 2% on Material (KARK), Qty: 179.34 LS, Amt: 179.34 15. Border Tiles 30 X 10 cms (KARK), Qty: 28.15 No, Amt: 3519.00 16. Glazed tiles 300X450 (KARK), Qty: 16.54 Sqm, Amt: 4119.33 17. Stone Dresser (with tools) (KARK), Qty: 41.21 Day, Amt: 17977.02 18. Machine polished granite stone slabs 20 mm (KARK), Qty: 216.37 Sqm, Amt: 119434.69 19. Binding wire (KARK), Qty: 67.00 Kg, Amt: 3690.36 20. TMT bars Fe 500 (KARK), Qty: 7.20 Tonne, Amt: 507920.30 21. Add Brush at 1% on cost of paint (KARK), Qty: 12.20 LS, Amt: 12.20 22. Enamel metal paint (KARK), Qty: 4.88 Ltr, Amt: 1014.77 23. Add providing and removing scaffolding at 3% on Labour (KARK), Qty: 1780.92 LS, Amt: 1780.92 24. Painter Class I (KARK), Qty: 39.01 Day, Amt: 16627.81 25. Add Wire brush, fine steel wool, putty, sand paper, at 3% on cost of paint (KARK), Qty: 9.35 LS, Amt: 9.35 26. Ready miX primer paint (Ready miX red lead paint) (KARK), Qty: 3.66 Ltr, Amt: 310.96 27. Add HOM of welding and grinding machine at 4% on Material (KARK), Qty: 629.18 LS, Amt: 629.18