RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Gijihalli Sanjeevini Shed. The project location is Arsikere, Karnataka, India. The reference number is RDPR/2024-25/IND2600/CALL-2 and it is closing on 1-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
24-Jul-2024
Closing Date
1-Aug-2024
Tender Amount
1221496.89
Tender Invite For Construction Materials Sanjeevini Shed In Geejihalli Gp 1. GIJIH_Broken stone aggregate 40 mm size, Qty: 9.68 Cum, Amt: 11526.23 2. GIJIH_Broken stone aggregate 20 mm size, Qty: 18.67 Cum, Amt: 24008.58 3. GIJIH_Broken stone aggregate 12 mm to 10 mm size, Qty: 9.14 Cum, Amt: 11747.53 4. GIJIH_Coarse sand (zone III), Qty: 42.42 Cum, Amt: 71086.58 5. GIJIH_Portland Cement, Qty: 19.88 Tonne, Amt: 116483.32 6. GIJIH_Mixer (concrete) - 1 cum Capacity, Qty: 3.39 Day, Amt: 4596.43 7. GIJIH_Add watering charges at 1 % on Material, Qty: 3997.06 Each, Amt: 3997.06 8. GIJIH_Add sundries charges at 1 % on Material, Qty: 7294.68 Each, Amt: 7294.68 9. GIJIH_Over Head & other Miscellaneous Charges, Qty: 102326.15 Each, Amt: 102326.15 10. GIJIH_Plasticizer / super plasticizer, Qty: 70.61 Kg, Amt: 4188.64 11. GIJIH_HOM of Vibrator 0.71 days, Qty: 1.67 Day, Amt: 282.42 12. GIJIH_Formwork, Centering & Scaffolding For Columns & Piers - 70%, Qty: 23272.60 Each, Amt: 23272.60 13. GIJIH_Formwork, Centering & Scaffolding for Beams & Lintels of Building - 60%, Qty: 22096.99 Each, Amt: 22096.99 14. GIJIH_Formwork, Centering & Scaffolding for Roof (Straight & Arched) - 50%, Qty: 2082.49 Each, Amt: 2082.49 15. GIJIH_TMT bars Fe 500, Qty: 2.20 Tonne, Amt: 132145.35 16. GIJIH_Binding wire, Qty: 20.43 Kg, Amt: 1125.28 17. GIJIH_Size stone 20 x 20 x 25 cms, Qty: 3444.41 Each, Amt: 40850.73 18. GIJIH_Bond stone 20 x 20 x 45 cm, Qty: 189.10 Each, Amt: 5043.43 19. GIJIH_Boulders, Qty: 1.30 Cum, Amt: 862.31 20. GIJIH_Mixer (concrete small used in culvert), Qty: 19.14 Hour, Amt: 804.02 21. GIJIH_Mason Class I (with tools), Qty: 138.03 Day, Amt: 60210.65 22. GIJIH_Mason Class II (with tools), Qty: 21.61 Day, Amt: 9102.97 23. GIJIH_Stone Chistler Class II, Qty: 16.21 Day, Amt: 6827.23 24. GIJIH_Casurina poles 100 - 150 mm, Qty: 21.83 m, Amt: 1035.85 25. GIJIH_Add Handling , loading and unloading at 1% on Material, Qty: 739.14 Each, Amt: 739.14 26. GIJIH_Add sundries charges at 2 % on Material, Qty: 160.31 Each, Amt: 160.31