RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Construction Material For Construction Of Kitchen At Govt High School Neelagal, Atnoor Gp, Sirwar. The project location is Koppa, Karnataka, India. The reference number is RDPR/2024-25/IND3134/CALL-2 and it is closing on 31-Jul-2024. Find more about this online tender from below to Submit your bid.
Posting Date
24-Jul-2024
Closing Date
31-Jul-2024
Tender Amount
464113.48
Supply Of Construction Material For Construction Of Kitchen At Govt High School Neelagal, Atnoor Gp, Sirwar 1. NL01.Granite/trap broken metal 100 mm and down size, Qty: 7.47 Cum, Amt: 7377.52 2. NL02.Coarse sand (zone III), Qty: 22.48 Cum, Amt: 37662.71 3. NL03.Add sundries charges at 1% on Material, Qty: 3213.21 Lump Sum for Each, Amt: 3213.21 4. NL04.Add watering charges at 1 % on Material, Qty: 1739.83 Lump Sum for Each, Amt: 1739.83 5. NL05.Over Head & other Miscellaneous Charges, Qty: 44021.80 Lump Sum for Each, Amt: 44021.80 6. NL06.Broken stone aggregate 40 mm size, Qty: 1.62 Cum, Amt: 1926.67 7. NL07.Broken stone aggregate 20 mm size, Qty: 11.28 Cum, Amt: 14501.14 8. NL08.Broken stone aggregate 12 mm to 10 mm size, Qty: 6.19 Cum, Amt: 7953.66 9. NL09.Portland Cement, Qty: 9.87 Tonne, Amt: 68870.96 10. NL10.Mixer (concrete) - 1 cum Capacity, Qty: 1.79 Day, Amt: 2423.58 11. NL11.Size stone 20 x 20 x 25 cms, Qty: 362.36 Each, Amt: 4297.61 12. NL12.Bond stone 20 x 20 x 45 cm, Qty: 21.90 Each, Amt: 584.10 13. NL13.Boulders, Qty: 0.16 Cum, Amt: 108.59 14. NL14.Mixer (concrete small used in culvert), Qty: 6.31 Hour, Amt: 264.87 15. NL15.Plasticizer / super plasticizer, Qty: 46.45 Kg, Amt: 2755.53 16. NL16.HOM of Vibrator 0.71 days, Qty: 1.10 Day, Amt: 185.78 17. NL17.TMT bars Fe 500, Qty: 1.60 Tonne, Amt: 112803.79 18. NL18.Binding wire, Qty: 14.88 Kg, Amt: 819.59 19. NL19.Solid concrete blocks (40 x 15 x 20 cms)-4.00 N/Sqmm, Qty: 217.54 No, Amt: 6439.20 20. NL20.Casurina poles 100 - 150 mm, Qty: 79.15 Millimeter, Amt: 3756.39 21. NL21.Add Handling , loading and unloading at 1% on Material, Qty: 71.82 Lump Sum for Each, Amt: 71.82 22. NL22.Add sundries charges at 2% on Material, Qty: 373.80 Lump Sum for Each, Amt: 373.80 23. NL23.Mathi/Nandi wood planks for panels 25 mm thick, Qty: 0.15 Cum, Amt: 7599.15 24. NL24.Add cutting and other wastage 5%, Qty: 1124.47 Lump Sum for Each, Amt: 1124.47 25. NL25.Add Handling , loading and unloading at 2% on Material, Qty: 1127.20 Lump Sum for Each, Amt: 1127.20