RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supplying Of Materials For The Construction Of Nrlm Shed. The project location is Koppa, Karnataka, India. The reference number is RDPR/2023-24/IND1908 and it is closing on 9-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
27-Jul-2024
Closing Date
9-Aug-2024
Tender Amount
1390672.86
Supplying Of Materials For The Construction Of Nrlm Shed 1512004004/Av/Gis/832714 Bagali Gp 1. Add White Cement for Pointing at 2 percentage on material, Qty: 157.25 Lump Sum for Each, Amt: 185.56 2. Border Tiles 30X10 cms per nos, Qty: 24.68 No, Amt: 3320.99 3. Glazed Tiles 300X450 per Sqm, Qty: 14.51 Sqm, Amt: 7754.65 4. Mason Class 2 with tools, Qty: 3.82 Day, Amt: 2252.39 5. White Cement per quintal, Qty: 0.01 Quintal, Amt: 14.08 6. Ceramic Tiles of Size 30X30 cum, Qty: 6.01 Sqm, Amt: 3508.11 7. Solid Concrete Blocks 40X20X20 cms 4.0 Nper sqm, Qty: 1779.96 No, Amt: 98716.42 8. Bolts and Nuts in Kg, Qty: 17.58 Kg, Amt: 1476.43 9. Jungle Wood Runners and Planks 9487, Qty: 0.76 Cum, Amt: 26059.11 10. Casurina Poles 75 to 150mm, Qty: 17.84 Mtr, Amt: 784.88 11. Silver oak or equivalent plank 38mm thick, Qty: 1.29 Cum, Amt: 34942.37 12. Add watering charges at 1 Percentage on Material mg, Qty: 4383.91 Lump Sum for Each, Amt: 5173.02 13. Mi.er concrete1 Cum Capacity mg, Qty: 4.26 Day, Amt: 11934.71 14. Broken stone aggregate 40 mm size mg, Qty: 5.67 Cum, Amt: 7085.17 15. Broken stone aggregate 20 mm size mg, Qty: 24.05 Cum, Amt: 33661.73 16. Broken stone aggregate 12 mm to 10 mm size mg, Qty: 13.86 Cum, Amt: 19819.33 17. Coarse sand zone 3 mg, Qty: 49.12 Cum, Amt: 76121.38 18. Portland Cement mg, Qty: 22.94 Tonne, Amt: 172031.60 19. MS flat mg, Qty: 389.48 Kg, Amt: 22609.09 20. Add Wire brush, fine steel wool, putty, sand paper, at 3Percentage on cost of paint mg, Qty: 6.78 Lump Sum for Each, Amt: 8.01 21. Add watering charges at 1 Percentage on Labour mg, Qty: 138.41 Lump Sum for Each, Amt: 163.33 22. Add sundries charges at 1 Percentage on Material mg, Qty: 8047.11 Lump Sum for Each, Amt: 9495.60 23. Add sundries charges at 1 Percentage on Labour mg, Qty: 51.04 Lump Sum for Each, Amt: 60.23 24. Add HOM of welding and grinding machine at 4Percentage on Material mg, Qty: 913.26 Lump Sum for Each, Amt: 1077.65 25. Add Handling , loading and unloading at 1Percentage on Material mg, Qty: 693.88 Lump Sum for Each, Amt: 818.79