RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Materials For Construction Of Panchayat Building At Handiganur Village Of Belagavi Taluk.. The project location is Belagavi, Karnataka, India. The reference number is RDPR/2024-25/IND3517 and it is closing on 8-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
31-Jul-2024
Closing Date
8-Aug-2024
Tender Amount
1463803.39
Supply Of Materials For Construction Of Panchayat Building At Handiganur Village Of Belagavi Taluk. 1. Add sundries charges at, 1 % on Material., Qty: 10776.90 Lump Sum for Each, Amt: 10776.91 2. LUMPSUM MATERIAL, Qty: 1.00 LS, Amt: 181313.60 3. Add Brush, Putty, Sand Paper at 2% on cost of paint., Qty: 111.47 Lump Sum for Each, Amt: 111.47 4. Water Proofing Cement Paint.,-, Qty: 69.67 Kg, Amt: 3970.97 5. Add Brush, Putty, Glue at 5% on cost of paint.,, Qty: 170.08 Lump Sum for Each, Amt: 170.08 6. Whitening-, Qty: 51.54 Kg, Amt: 960.71 7. Dry distemper,, Qty: 51.54 Kg, Amt: 2473.92 8. Add Brush at 1% on cost of paint.,, Qty: 2.69 Lump Sum for Each, Amt: 2.69 9. Enamel metal paint.,, Qty: 1.08 Ltr, Amt: 221.58 10. Add Wire brush, fine steel wool, putty, sand paper, at 3% on cost of paint.,, Qty: 2.75 Lump Sum for Each, Amt: 2.75 11. Ready mix primer paint (Ready mix red lead paint).,, Qty: 1.08 Ltr, Amt: 91.43 12. Add HOM of welding and grinding machine At 4% on Material,, Qty: 370.27 Lump Sum for Each, Amt: 370.27 13. Welder Grade I,, Qty: 5.98 Day, Amt: 3072.98 14. Fitter Class I,, Qty: 5.98 Day, Amt: 3072.98 15. M.S Rods,, Qty: 97.88 Kg, Amt: 7830.44 16. Painter Class I.,, Qty: 89.96 Day, Amt: 46266.74 17. Add Brush, putty, sand paper, roller at 5% on cost of paint.,, Qty: 335.01 Lump Sum for Each, Amt: 335.01 18. White Cement based putty At 2sqm / kg at Rs. 1050 per Kgs.,, Qty: 257.70 Kg, Amt: 3350.10 19. Add providing and removing scaffolding at 3% on Labour.,, Qty: 2843.14 Lump Sum for Each, Amt: 2843.15 20. Add watering charges at 1 % on Labour.,, Qty: 130.62 Lump Sum for Each, Amt: 130.62 21. Add sundries charges at 1 % on Labour.,, Qty: 130.62 Lump Sum for Each, Amt: 130.62 22. Granite / trap broken metal 100 mm and down size, Qty: 14.46 Cum, Amt: 16532.36 23. Add Handling loading and unloading at 1% on Material.,, Qty: 274.71 Lump Sum for Each, Amt: 274.72 24. Burnt bricks class 35 (non modular).,, Qty: 22249.86 No, Amt: 177998.88 25. Binding wire,., Qty: 67.38 Kg, Amt: 3705.90