RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of Solid Waste Disposal And Management Of Koppa Srp Center In Heggur Gp At Bilagi Taluka. The project location is Koppa, Karnataka, India. The reference number is RDPR/2024-25/IND3630/CALL-2 and it is closing on 28-Aug-2024. Find more about this online tender from below to Submit your bid.
Posting Date
21-Aug-2024
Closing Date
28-Aug-2024
Tender Amount
1329843.82
Construction Of Solid Waste Disposal And Management Of Koppa Srp Center In Heggur Gp At Bilagi Taluka 1. HGGRR Add sundries charges at 1 percent on Material, Qty: 8967.84 LS, Amt: 8967.84 2. HGGRR Over Head & other Miscellaneous Charges, Qty: 111059.90 LS, Amt: 111059.90 3. HGGRR Broken stone aggregate 40 mm size, Qty: 4.45 Cum, Amt: 5294.78 4. HGGRR Broken stone aggregate 20 mm size, Qty: 12.57 Cum, Amt: 16159.45 5. HGGRR Broken stone aggregate 12 mm to 10 mm size, Qty: 7.60 Cum, Amt: 9771.40 6. HGGRR Coarse sand (zone III), Qty: 53.53 Cum, Amt: 89703.44 7. HGGRR Portland Cement, Qty: 21.88 Tonne, Amt: 152715.42 8. HGGRR Mixer (concrete) - 1 cum Capacity, Qty: 2.36 Day, Amt: 3200.16 9. HGGRR Add watering charges at 1 percent on Material, Qty: 4999.35 LS, Amt: 4999.35 10. HGGRR Silver oak or equivalent planks 38 mm thick, Qty: 0.59 Cum, Amt: 12476.70 11. HGGRR Jungle wood runners and planks, Qty: 0.02 Cum, Amt: 582.00 12. HGGRR Casurina Poles 75 - 100 mm dia, Qty: 2.99 Mtr, Amt: 111.50 13. HGGRR Add Handling , loading and unloading at 2percent on Material, Qty: 806.59 LS, Amt: 806.59 14. HGGRR Casurina poles 100 - 150 mm, Qty: 44.24 Mtr, Amt: 2099.61 15. HGGRR Add sundries charges at 2 percent on Material, Qty: 289.76 LS, Amt: 289.76 16. HGGRR Plasticizer / super plasticizer, Qty: 68.21 Kg, Amt: 4046.15 17. HGGRR HOM of Vibrator 0.71 days, Qty: 1.61 Day, Amt: 272.09 18. HGGRR Size stone 20 x 20 x 25 cms, Qty: 6053.39 Each, Amt: 71793.15 19. HGGRR Bond stone 20 x 20 x 45 cm, Qty: 355.25 Each, Amt: 9474.53 20. HGGRR Boulders, Qty: 2.59 Cum, Amt: 1719.30 21. HGGRR Mixer (concrete small used in culvert), Qty: 32.22 Hour, Amt: 1353.24 22. HGGRR Mason Class I (with tools), Qty: 37.29 Day, Amt: 16267.91 23. HGGRR Mason Class II (with tools), Qty: 101.01 Day, Amt: 42544.66 24. HGGRR Stone Chistler Class II, Qty: 9.02 Day, Amt: 3799.14 25. HGGRR Add sundries charges at 1 percent on Labour, Qty: 301.06 LS, Amt: 301.06 26. HGGRR Add watering charges at 1 percent on Labour, Qty: 301.06 LS, Amt: 301.06