SOUTH CENTRAL RAILWAY has floated a e tender for "Scr Construction Organisation-Guntakal Division - New Bg Line between Guntakal West & Mallappa Gate Stations with Rail over Rail(Ror) Connectivity (9.64 Km) - I) Proposed Guntakal West Yard Remodelin.... The project location is SECUNDERABAD, Telangana, India. The reference number is 26-CAO-C-SC2024 and it is closing on 17-Sep-2024. Find more about this online tender from below to Submit your bid.
Posting Date
24-Aug-2024
Closing Date
17-Sep-2024
Tender Amount
391204236.38
SCR Construction Organisation-Guntakal division - New BG line between Guntakal west & Mallappa Gate stations with Rail over Rail(RoR) connectivity (9.64 Km) - i) Proposed Guntakal West yard remodeling - (a) Earthwork information including blanketing to IRDGE-0004 specifications,(b) Construction of Major & Minor bridges,(c) Construction of station building & Goomties, (d) Laying & linking of Track, slewing/regarding/CTRP of existing track and other balance works at Guntakal West yard and ii) Proposed Mallappa Gate yard remodeling- a) Earthwork in formation including blanketing to IRS: GE-0004 specifications, b) Construction of Minor Bridges, c) Laying & linking of track, slewing/regarding /CTRP of existing track and other miscellaneous works within Mallappa Gate yard." Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms etc. with contractor's own earth conforming to Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content to OMC, mechanical compaction to specified density a n d dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. 2) Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based on initial ground levels before doing benching and (ii) final profile of the bank worked out with final levels as per prevailing guidelines. Using Soil Class SQ1 2 011032 33800.00 cum 268.50 9075300.00 AT Par 9075300.00