RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Materials For Construction Of Snajeevini Shed In Hiriyur Gp. The project location is Arsikere, Karnataka, India. The reference number is RDPR/2024-25/IND2602/CALL-4 and it is closing on 25-Sep-2024. Find more about this online tender from below to Submit your bid.
Posting Date
18-Sep-2024
Closing Date
25-Sep-2024
Tender Amount
1198275.69
Material Supply For Construction Of Sanjeevini Shed 1. Add sundries charges at 1 % on Material HRW, Qty: 8020.00 Each, Amt: 8020.00 2. Over Head & other Miscellaneous Charges HRW, Qty: 100278.39 Each, Amt: 100278.39 3. Broken stone aggregate 40 mm size HRW, Qty: 2.41 Cum, Amt: 2864.29 4. Broken stone aggregate 20 mm size HRW, Qty: 27.11 Cum, Amt: 34855.21 5. Broken stone aggregate 12 mm to 10 mm size HRW, Qty: 13.95 Cum, Amt: 17936.55 6. Coarse sand (zone III) HRW, Qty: 42.11 Cum, Amt: 70570.95 7. Portland Cement HRW, Qty: 24.96 Tonne, Amt: 146284.94 8. Mixer (concrete) - 1 cum Capacity HRW, Qty: 4.36 Day, Amt: 5907.14 9. Add watering charges at 1 % on Material HRW, Qty: 3941.09 Each, Amt: 3941.09 10. Plasticizer / super plasticizer HRW, Qty: 166.02 Kg, Amt: 9848.48 11. HOM of Vibrator 0.71 days HRW, Qty: 3.93 Day, Amt: 664.03 12. Formwork, Centering & Scaffolding For Columns & Piers - 70% HRW, Qty: 31092.18 Each, Amt: 31092.18 13. Formwork, Centering & Scaffolding for Beams & Lintels of Building - 60% HRW, Qty: 39212.64 Each, Amt: 39212.64 14. Formwork, Centering & Scaffolding for Roof (Straight & Arched) - 50% HRW, Qty: 54976.60 Each, Amt: 54976.60 15. TMT bars Fe 500 HRW, Qty: 5.35 Tonne, Amt: 322186.28 16. Binding wire HRW, Qty: 49.81 Kg, Amt: 2743.53 17. Size stone 20 x 20 x 25 cms HRW, Qty: 40.16 Each, Amt: 476.33 18. Bond stone 20 x 20 x 45 cm HRW, Qty: 2.21 Each, Amt: 58.81 19. Boulders HRW, Qty: 0.02 Cum, Amt: 10.04 20. Mixer (concrete small used in culvert) HRW, Qty: 12.99 Hour, Amt: 545.41 21. Mason Class I (with tools) HRW, Qty: 91.57 Day, Amt: 39942.70 22. Mason Class II (with tools) HRW, Qty: 19.99 Day, Amt: 8420.63 23. Stone Chistler Class II HRW, Qty: 0.19 Day, Amt: 79.61 24. Casurina poles 100 - 150 mm HRW, Qty: 11.45 m, Amt: 543.57 25. Add Handling , loading and unloading at 1% on Material HRW, Qty: 693.25 Each, Amt: 693.25 26. Add sundries charges at 2 % on Material HRW, Qty: 139.16 Each, Amt: 139.16