RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Supply Of Material For Construction Of Kitchen Room For Government High School At Hunashyala P.Y Village Of Mudalagi Taluka.. The project location is Koppa, Karnataka, India. The reference number is RDPR/2024-25/IND4642/CALL-2 and it is closing on 1-Oct-2024. Find more about this online tender from below to Submit your bid.
Posting Date
21-Sep-2024
Closing Date
1-Oct-2024
Tender Amount
1259979.64
Supply Of Material For Construction Of Kitchen Room For Government High School At Hunashyala P.Y Village Of Mudalagi Taluka. 1. Broken stone aggregate 20 mm size,, Qty: 12.31 Cum, Amt: 14657.31 2. Broken stone aggregate 12 mm to 10 mm size,, Qty: 12.55 Cum, Amt: 16135.28 3. Broken stone aggregate 40 mm size,, Qty: 9.48 Cum, Amt: 12190.85 4. Coarse sand (zone III),, Qty: 59.59 Cum, Amt: 99866.59 5. Portland Cement,., Qty: 23.43 Tonne, Amt: 163565.14 6. Mixer (concrete) - 1 cum Capacity.,, Qty: 3.06 Day, Amt: 4146.11 7. Add watering charges at 1 % on Material.,, Qty: 3840.51 Lump Sum for Each, Amt: 3840.51 8. Add sundries charges at, 1 % on Material., Qty: 8089.23 Lump Sum for Each, Amt: 8089.23 9. Over Head, & other Miscellaneous Charges, Qty: 103037.55 Lump Sum for Each, Amt: 103037.56 10. Plasticizer / super plasticizer.,., Qty: 42.22 Kg, Amt: 2504.44 11. HOM of Vibrator 0.71 days.,, Qty: 1.00 Day, Amt: 168.87 12. Silver oak, or equivalent planks 38 mm thick.,, Qty: 0.55 Cum, Amt: 11726.70 13. Jungle wood runners and plank.,, Qty: 0.08 Cum, Amt: 2426.94 14. Casurina Poles 75 - 100 mm dia., Qty: 17.22 m, Amt: 642.21 15. Add Handling loading and unloading at 2% on Material.,, Qty: 784.66 Lump Sum for Each, Amt: 784.67 16. TMT bars Fe 500,., Qty: 1.31 Tonne, Amt: 92331.84 17. Binding wire,., Qty: 12.18 Kg, Amt: 670.87 18. Rubble stones.,, Qty: 17.28 Cum, Amt: 8230.47 19. Bond stone 20 x 20 x 45 cm.,, Qty: 325.39 Each, Amt: 8678.16 20. Mixer (concrete small used in culvert.), Qty: 34.20 Hour, Amt: 1436.49 21. Stone at quarry-1, Qty: 36.19 Cum, Amt: 12882.68 22. Laboratory Asst. (SSLC Passed)/Mate/Supervisor,, Qty: 3.95 Day, Amt: 1781.57 23. Add for scaffolding 5 per cent of cost of labour and material, Qty: 2319.73 Lump Sum for Each, Amt: 2319.73 24. Add sundries charges at 1 % on Labour.,, Qty: 267.38 Lump Sum for Each, Amt: 267.38 25. Add watering charges at 1 % on Labour.,, Qty: 267.38 Lump Sum for Each, Amt: 267.38 26. MS pipes of 80 mm to 100 mm dia,, Qty: 311.85 Kg, Amt: 11628.75 27. RMS Gusset plate,, Qty: 74.25 Kg, Amt: 3775.76