RURAL DEVELOPMENT AND PANCHAYAT RAJ DEPARTMENT, GOVT OF KARNATAKA has floated a e tender for Construction Of School Compound Mudenur Village Government High School. The project location is Koppa, Karnataka, India. The reference number is RDPR/2024-25/IND5076 and it is closing on 1-Oct-2024. Find more about this online tender from below to Submit your bid.
Posting Date
23-Sep-2024
Closing Date
1-Oct-2024
Tender Amount
686455.36
Construction Of School Compound Mudenur Village Government High School 1. MUDENOORTransportation loading and unloadi, Qty: 17.93 Lump Sum for Each, Amt: 17.93 2. MUDENOORTools and Plant, Qty: 35.85 Lump Sum for Each, Amt: 35.85 3. MUDENOORHOM of cutting and grinding machine - 1, Qty: 10.00 hr, Amt: 1940.00 4. MUDENOORHOM of welding and grinding machine, Qty: 0.62 Day, Amt: 727.50 5. MUDENOORMechanic Class II/Mechanic HmP Grade I/EME Grade, Qty: 2.50 Day, Amt: 1248.58 6. MUDENOORWelder Grade I, Qty: 1.25 Day, Amt: 642.85 7. MUDENOORAnticorrosive bituminous paint (black), Qty: 0.94 Ltr, Amt: 93.75 8. MUDENOORBall bearing hinges heavy duty, Qty: 1.25 No, Amt: 296.61 9. MUDENOORCast iron spike, Qty: 5.62 No, Amt: 476.72 10. MUDENOOR40 x 6 mm MS Plates, Qty: 8.45 Kg, Amt: 675.75 11. MUDENOOR36 mm x 6mm MS Plates, Qty: 15.78 Kg, Amt: 1262.75 12. MUDENOOR16 x 16 mm MS Square rod, Qty: 17.76 Kg, Amt: 1420.75 13. MUDENOOR50 mm dia MS Hollow pipe B Class 14 Gauge, Qty: 13.03 Kg, Amt: 662.80 14. MUDENOORAdd providing and removing scaffolding at 3% on Labour, Qty: 91.73 Lump Sum for Each, Amt: 91.73 15. MUDENOORPainter Class I, Qty: 5.95 Day, Amt: 3061.87 16. MUDENOORAdd Brush, putty at 5% on cost of distemper primer, Qty: 62.62 Lump Sum for Each, Amt: 62.62 17. MUDENOORDistemper primer, Qty: 17.86 Ltr, Amt: 1518.14 18. MUDENOORHOM of Vibrator 0.71 days, Qty: 0.78 Day, Amt: 228.43 19. MUDENOORPlasticizer / super plasticizer, Qty: 33.08 Kg, Amt: 6317.33 20. MUDENOORAdd sundries charges at 2 % on Material, Qty: 208.66 Lump Sum for Each, Amt: 208.66 21. MUDENOORAdd Handling , loading and unloading at 1% on Material, Qty: 117.56 Lump Sum for Each, Amt: 117.56 22. MUDENOORCasurina poles 100 - 150 mm, Qty: 120.49 Mtr, Amt: 5718.34 23. MUDENOORStone Chistler Class II, Qty: 65.20 Day, Amt: 32565.33 24. MUDENOORMason Class II (with tools), Qty: 86.94 Day, Amt: 43420.44 25. MUDENOORMason Class I (with tools), Qty: 65.20 Day, Amt: 33533.63 26. MUDENOORBoulders, Qty: 5.22 Cum, Amt: 3479.34